Commercial Structures for Integrated CCS-EOR Projects
In this paper, we evaluate alternate commercial structures for an integrated CCS-EOR project where the source of CO[subscript 2] is a coal-fired power plant, and the CO[subscript 2] is transported via a dedicated pipeline to an oil field where the CO[subscript 2] is injected for EOR. We evaluate alt...
Main Authors: | Agarwal, Anna, Parsons, John E. |
---|---|
Other Authors: | Sloan School of Management |
Format: | Article |
Language: | en_US |
Published: |
Elsevier
2015
|
Online Access: | http://hdl.handle.net/1721.1/95928 https://orcid.org/0000-0001-9313-4865 |
Similar Items
-
Managing risks in energy capital projects -- the value of contractual risk-sharing in CCS-EOR
by: Agarwal, Anna
Published: (2014) -
Simulations of EoR signature detection
by: Rogers, Alan E.E.
Published: (2024) -
Active antenna for spectrum monitor and EOR
by: Rogers, Alan E.E.
Published: (2024) -
The EoR sensitivity of the Murchison Widefield Array
by: Cappallo, Roger J., et al.
Published: (2014) -
Simulations of EoR with different fitting parameters
by: Rogers, Alan E.E.
Published: (2024)