A systems approach to procurement of automated technology

Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, 2015. In conjunction with the Leaders for Global Operations Program at MIT.

Bibliographic Details
Main Author: Ebner, Ellen E. (Ellen Elizabeth)
Other Authors: Daniel Whitney and Steven Spear.
Format: Thesis
Language:eng
Published: Massachusetts Institute of Technology 2015
Subjects:
Online Access:http://hdl.handle.net/1721.1/98980
_version_ 1826213183492194304
author Ebner, Ellen E. (Ellen Elizabeth)
author2 Daniel Whitney and Steven Spear.
author_facet Daniel Whitney and Steven Spear.
Ebner, Ellen E. (Ellen Elizabeth)
author_sort Ebner, Ellen E. (Ellen Elizabeth)
collection MIT
description Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, 2015. In conjunction with the Leaders for Global Operations Program at MIT.
first_indexed 2024-09-23T15:44:39Z
format Thesis
id mit-1721.1/98980
institution Massachusetts Institute of Technology
language eng
last_indexed 2024-09-23T15:44:39Z
publishDate 2015
publisher Massachusetts Institute of Technology
record_format dspace
spelling mit-1721.1/989802022-01-28T14:56:55Z A systems approach to procurement of automated technology Ebner, Ellen E. (Ellen Elizabeth) Daniel Whitney and Steven Spear. Leaders for Global Operations Program. Leaders for Global Operations Program at MIT Massachusetts Institute of Technology. Engineering Systems Division Sloan School of Management Sloan School of Management. Engineering Systems Division. Leaders for Global Operations Program. Thesis: M.B.A., Massachusetts Institute of Technology, Sloan School of Management, 2015. In conjunction with the Leaders for Global Operations Program at MIT. Thesis: S.M., Massachusetts Institute of Technology, Engineering Systems Division, 2015. In conjunction with the Leaders for Global Operations Program at MIT. Cataloged from PDF version of thesis. Includes bibliographical references (page 89). Company A's Product Group B (PGB) is developing an automated system to complete final assembly of the Component, a structural member of the product that includes technology supporting two features of the product's competitive advantage. PGB contracted with an industry partner to supply the automated assembly system, which will be built and tested in 2015. Amid the wide spread perception that automation projects purchased from suppliers include schedule delays and performance deficiencies, PGB must specify the activities to verify automated assembly system performance prior to purchasing it from the Supplier. Interviews with project teams were completed to gather data about the procurement of existing automated systems at Company A. A range of success in completing project buyoff on time with no deficiencies was found with variation in buyoff results mainly associated with the presence or lack of fully-defined requirements and detailed procedures to verify and validate the system according to the requirements. The findings led to the hypothesis that automation system buyoff can be improved by applying an approach that includes development of good requirements, planning detailed procedures to verify and validate the system according to the requirements, and tracking progress towards meeting requirements to a schedule. To test the hypothesis, an approach to buyoff plan development and execution incorporating these factors was defined and then evaluated using a model. Buyoff of the automated assembly system will occur in 2015 according to the approach defined in this research. Results should be evaluated to validate the hypothesis and provide evidence for further buyoff plan improvement. by Ellen E. Ebner. M.B.A. S.M. 2015-09-29T18:56:35Z 2015-09-29T18:56:35Z 2015 2015 Thesis http://hdl.handle.net/1721.1/98980 921155715 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 89 pages application/pdf Massachusetts Institute of Technology
spellingShingle Sloan School of Management.
Engineering Systems Division.
Leaders for Global Operations Program.
Ebner, Ellen E. (Ellen Elizabeth)
A systems approach to procurement of automated technology
title A systems approach to procurement of automated technology
title_full A systems approach to procurement of automated technology
title_fullStr A systems approach to procurement of automated technology
title_full_unstemmed A systems approach to procurement of automated technology
title_short A systems approach to procurement of automated technology
title_sort systems approach to procurement of automated technology
topic Sloan School of Management.
Engineering Systems Division.
Leaders for Global Operations Program.
url http://hdl.handle.net/1721.1/98980
work_keys_str_mv AT ebnerelleneellenelizabeth asystemsapproachtoprocurementofautomatedtechnology
AT ebnerelleneellenelizabeth systemsapproachtoprocurementofautomatedtechnology