Pipe dream : why Utah's water managers continue to prioritize supply-side solutions
Thesis: M.C.P., Massachusetts Institute of Technology, Department of Urban Studies and Planning, 2015.
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | eng |
Published: |
Massachusetts Institute of Technology
2015
|
Subjects: | |
Online Access: | http://hdl.handle.net/1721.1/99087 |
_version_ | 1826191417452527616 |
---|---|
author | Schaefer, Chloe |
author2 | Judy Layzer. |
author_facet | Judy Layzer. Schaefer, Chloe |
author_sort | Schaefer, Chloe |
collection | MIT |
description | Thesis: M.C.P., Massachusetts Institute of Technology, Department of Urban Studies and Planning, 2015. |
first_indexed | 2024-09-23T08:55:32Z |
format | Thesis |
id | mit-1721.1/99087 |
institution | Massachusetts Institute of Technology |
language | eng |
last_indexed | 2024-09-23T08:55:32Z |
publishDate | 2015 |
publisher | Massachusetts Institute of Technology |
record_format | dspace |
spelling | mit-1721.1/990872019-04-10T19:45:02Z Pipe dream : why Utah's water managers continue to prioritize supply-side solutions Why Utah's water managers continue to prioritize supply-side solutions Schaefer, Chloe Judy Layzer. Massachusetts Institute of Technology. Department of Urban Studies and Planning. Massachusetts Institute of Technology. Department of Urban Studies and Planning. Urban Studies and Planning. Thesis: M.C.P., Massachusetts Institute of Technology, Department of Urban Studies and Planning, 2015. Cataloged from PDF version of thesis. Includes bibliographical references (pages 51-59). More than 150 years ago, the Mormon pioneers entered the Salt Lake Valley and immediately set to work digging irrigation ditches and canals to harness what water there was for their farms. Since then, Utah water managers have solved water supply problems by building large infrastructure projects. Today, Utah's population is growing rapidly, but the water supplies that enable its desert oases are not, and climate change is expected to make matters worse. This increasing tension between growing populations and dwindling water supplies is not unique to Utah. However, while other states in the region have implemented aggressive demand-side measures to conserve water, Utah's conservation efforts have been relatively minimal. Utah's history of water engineering, the cultural importance of agriculture, the precedent of federal funding for large water projects, and some of the cheapest water rates in the country make demand-side measures a tough sell for addressing water needs in Utah. However, supply-side projects are costly for taxpayers and for the environment, take decades to complete, and are based on unreliable forecasts of future water demand and uncertain water sources. It is time for Utahans to look past traditional supply-side solutions and embrace water conservation measures, requiring changes to the dominant water planning mindset. In order to do this, the state could take regulatory action, and both the state and LDS Church can act as water efficiency exemplars. It is also time for Utahans to become more involved in Utah's water planning and decide for themselves whether to continue attempting to conquer nature or to live within its bounds. by Chloe Schaefer. M.C.P. 2015-09-29T19:02:29Z 2015-09-29T19:02:29Z 2015 2015 Thesis http://hdl.handle.net/1721.1/99087 922033808 eng M.I.T. theses are protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. See provided URL for inquiries about permission. http://dspace.mit.edu/handle/1721.1/7582 59 pages application/pdf n-us-ut Massachusetts Institute of Technology |
spellingShingle | Urban Studies and Planning. Schaefer, Chloe Pipe dream : why Utah's water managers continue to prioritize supply-side solutions |
title | Pipe dream : why Utah's water managers continue to prioritize supply-side solutions |
title_full | Pipe dream : why Utah's water managers continue to prioritize supply-side solutions |
title_fullStr | Pipe dream : why Utah's water managers continue to prioritize supply-side solutions |
title_full_unstemmed | Pipe dream : why Utah's water managers continue to prioritize supply-side solutions |
title_short | Pipe dream : why Utah's water managers continue to prioritize supply-side solutions |
title_sort | pipe dream why utah s water managers continue to prioritize supply side solutions |
topic | Urban Studies and Planning. |
url | http://hdl.handle.net/1721.1/99087 |
work_keys_str_mv | AT schaeferchloe pipedreamwhyutahswatermanagerscontinuetoprioritizesupplysidesolutions AT schaeferchloe whyutahswatermanagerscontinuetoprioritizesupplysidesolutions |