Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project
This report provides a case study on the NATM tunnel induced ground movements at Contract T06 tunnels of the Deep Tunnel Sewerage System (DTSS) Project in Singapore. The main objective of this report is to prepare a case history data, based on the settlement monitoring results, that provides a refe...
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/11867 |
_version_ | 1824453077771485184 |
---|---|
author | Birsen Zeyrek. |
author2 | Ashraf Mohamed Hefny |
author_facet | Ashraf Mohamed Hefny Birsen Zeyrek. |
author_sort | Birsen Zeyrek. |
collection | NTU |
description | This report provides a case study on the NATM tunnel induced ground movements at Contract T06 tunnels of the Deep Tunnel Sewerage System (DTSS) Project in Singapore. The main objective of this report is to prepare a case history data, based on the settlement monitoring results, that provides a reference for future new tunneling projects within similar conditions. |
first_indexed | 2024-10-01T03:59:02Z |
format | Thesis |
id | ntu-10356/11867 |
institution | Nanyang Technological University |
language | English |
last_indexed | 2024-10-01T03:59:02Z |
publishDate | 2008 |
record_format | dspace |
spelling | ntu-10356/118672023-03-03T19:14:50Z Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project Birsen Zeyrek. Ashraf Mohamed Hefny School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering::Geotechnical This report provides a case study on the NATM tunnel induced ground movements at Contract T06 tunnels of the Deep Tunnel Sewerage System (DTSS) Project in Singapore. The main objective of this report is to prepare a case history data, based on the settlement monitoring results, that provides a reference for future new tunneling projects within similar conditions. Master of Science (Geotechnical Engineering) 2008-09-25T06:31:09Z 2008-09-25T06:31:09Z 2004 2004 Thesis http://hdl.handle.net/10356/11867 en Nanyang Technological University 163 p. application/pdf |
spellingShingle | DRNTU::Engineering::Civil engineering::Geotechnical Birsen Zeyrek. Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project |
title | Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project |
title_full | Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project |
title_fullStr | Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project |
title_full_unstemmed | Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project |
title_short | Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project |
title_sort | ground settlement of natm tunnels at contract t06 of singapore dtss project |
topic | DRNTU::Engineering::Civil engineering::Geotechnical |
url | http://hdl.handle.net/10356/11867 |
work_keys_str_mv | AT birsenzeyrek groundsettlementofnatmtunnelsatcontractt06ofsingaporedtssproject |