Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project

This report provides a case study on the NATM tunnel induced ground movements at Contract T06 tunnels of the Deep Tunnel Sewerage System (DTSS) Project in Singapore. The main objective of this report is to prepare a case history data, based on the settlement monitoring results, that provides a refe...

Full description

Bibliographic Details
Main Author: Birsen Zeyrek.
Other Authors: Ashraf Mohamed Hefny
Format: Thesis
Language:English
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/11867
_version_ 1824453077771485184
author Birsen Zeyrek.
author2 Ashraf Mohamed Hefny
author_facet Ashraf Mohamed Hefny
Birsen Zeyrek.
author_sort Birsen Zeyrek.
collection NTU
description This report provides a case study on the NATM tunnel induced ground movements at Contract T06 tunnels of the Deep Tunnel Sewerage System (DTSS) Project in Singapore. The main objective of this report is to prepare a case history data, based on the settlement monitoring results, that provides a reference for future new tunneling projects within similar conditions.
first_indexed 2024-10-01T03:59:02Z
format Thesis
id ntu-10356/11867
institution Nanyang Technological University
language English
last_indexed 2024-10-01T03:59:02Z
publishDate 2008
record_format dspace
spelling ntu-10356/118672023-03-03T19:14:50Z Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project Birsen Zeyrek. Ashraf Mohamed Hefny School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering::Geotechnical This report provides a case study on the NATM tunnel induced ground movements at Contract T06 tunnels of the Deep Tunnel Sewerage System (DTSS) Project in Singapore. The main objective of this report is to prepare a case history data, based on the settlement monitoring results, that provides a reference for future new tunneling projects within similar conditions. Master of Science (Geotechnical Engineering) 2008-09-25T06:31:09Z 2008-09-25T06:31:09Z 2004 2004 Thesis http://hdl.handle.net/10356/11867 en Nanyang Technological University 163 p. application/pdf
spellingShingle DRNTU::Engineering::Civil engineering::Geotechnical
Birsen Zeyrek.
Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project
title Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project
title_full Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project
title_fullStr Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project
title_full_unstemmed Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project
title_short Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project
title_sort ground settlement of natm tunnels at contract t06 of singapore dtss project
topic DRNTU::Engineering::Civil engineering::Geotechnical
url http://hdl.handle.net/10356/11867
work_keys_str_mv AT birsenzeyrek groundsettlementofnatmtunnelsatcontractt06ofsingaporedtssproject