Ground settlement of NATM tunnels at contract T06 of Singapore DTSS project
This report provides a case study on the NATM tunnel induced ground movements at Contract T06 tunnels of the Deep Tunnel Sewerage System (DTSS) Project in Singapore. The main objective of this report is to prepare a case history data, based on the settlement monitoring results, that provides a refe...
Main Author: | Birsen Zeyrek. |
---|---|
Other Authors: | Ashraf Mohamed Hefny |
Format: | Thesis |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/11867 |
Similar Items
-
Ground behaviour due to tunnelling at MRT NEL C-705 project
by: Dave Jugo Prakoso Witjaksono
Published: (2008) -
Behaviour of joints in tunnel linings
by: Alevey, Niall Mac, et al.
Published: (2008) -
Settlement of soft clay improved by vertical drains
by: Choi, Lok Ching.
Published: (2010) -
1-D settlement characteristics of unsaturated soils
by: Li, Bing.
Published: (2009) -
Experimental investigation into load settlement characteristics of piled rafts in sand
by: Leong, Hazel Xueling.
Published: (2011)