Soil heave and pile heave caused by pile installation
Pile installation will lead to vertical and horizontal soil movements around the pile. The vertical soil movements will cause heave of piles which have already been installed in the vicinity. As a result, tensile force may be induced in the existing piles. The horizontal soil movements induced by pi...
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | English |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/12235 |