Optimal skeleton-network restoration considering generator start-up sequence and load pickup
Power system restoration comprises of three stages, i.e., the preparation stage, system restoration stage, and load restoration stage. This paper addresses the first two stages by a new skeleton-network restoration strategy considering the generator start-up sequence (GSUS) and load pickup. The prop...
Main Authors: | , , , , , |
---|---|
Other Authors: | |
Format: | Journal Article |
Language: | English |
Published: |
2020
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/141192 |
_version_ | 1811689924337860608 |
---|---|
author | Sun, Lei Lin, Zhenzhi Xu, Yan Wen, Fushuan Zhang, Can Xue, Yusheng |
author2 | School of Electrical and Electronic Engineering |
author_facet | School of Electrical and Electronic Engineering Sun, Lei Lin, Zhenzhi Xu, Yan Wen, Fushuan Zhang, Can Xue, Yusheng |
author_sort | Sun, Lei |
collection | NTU |
description | Power system restoration comprises of three stages, i.e., the preparation stage, system restoration stage, and load restoration stage. This paper addresses the first two stages by a new skeleton-network restoration strategy considering the generator start-up sequence (GSUS) and load pickup. The proposed restoration strategy consists of three mathematical models: 1) GSUS model; 2) transmission line restoration (TLR) model; and 3) load pickup (LDP) model. The GSUS model aims to maximize the overall system generated energy considering the actual power system topology. The TLR model is to attain an optimal skeleton-network by identifying the restoration sequence of transmission lines. Critical loads are restored to keep the voltage within a specified respective threshold, and the load amounts are optimized in the LDP model. The proposed GSUS model and TLR model are both solved by the branch-and-bound method, while the LDR model is solved by the interior point method as well as the branch-and-cut method. Finally, the performance of the proposed method is demonstrated by two case studies on the New England 10-unit 39-bus system and an actual power system in Guangdong, China, respectively. |
first_indexed | 2024-10-01T05:55:50Z |
format | Journal Article |
id | ntu-10356/141192 |
institution | Nanyang Technological University |
language | English |
last_indexed | 2024-10-01T05:55:50Z |
publishDate | 2020 |
record_format | dspace |
spelling | ntu-10356/1411922020-06-05T00:58:42Z Optimal skeleton-network restoration considering generator start-up sequence and load pickup Sun, Lei Lin, Zhenzhi Xu, Yan Wen, Fushuan Zhang, Can Xue, Yusheng School of Electrical and Electronic Engineering Engineering::Electrical and electronic engineering System Restoration Black Start Power system restoration comprises of three stages, i.e., the preparation stage, system restoration stage, and load restoration stage. This paper addresses the first two stages by a new skeleton-network restoration strategy considering the generator start-up sequence (GSUS) and load pickup. The proposed restoration strategy consists of three mathematical models: 1) GSUS model; 2) transmission line restoration (TLR) model; and 3) load pickup (LDP) model. The GSUS model aims to maximize the overall system generated energy considering the actual power system topology. The TLR model is to attain an optimal skeleton-network by identifying the restoration sequence of transmission lines. Critical loads are restored to keep the voltage within a specified respective threshold, and the load amounts are optimized in the LDP model. The proposed GSUS model and TLR model are both solved by the branch-and-bound method, while the LDR model is solved by the interior point method as well as the branch-and-cut method. Finally, the performance of the proposed method is demonstrated by two case studies on the New England 10-unit 39-bus system and an actual power system in Guangdong, China, respectively. MOE (Min. of Education, S’pore) 2020-06-05T00:58:42Z 2020-06-05T00:58:42Z 2018 Journal Article Sun, L., Lin, Z., Xu, Y., Wen, F., Zhang, C., & Xue, Y. (2019). Optimal skeleton-network restoration considering generator start-up sequence and load pickup. IEEE Transactions on Smart Grid, 10(3), 3174-3185. doi:10.1109/TSG.2018.2820012 1949-3053 https://hdl.handle.net/10356/141192 10.1109/TSG.2018.2820012 2-s2.0-85044856815 3 10 3174 3185 en IEEE Transactions on Smart Grid © 2018 IEEE. All rights reserved. |
spellingShingle | Engineering::Electrical and electronic engineering System Restoration Black Start Sun, Lei Lin, Zhenzhi Xu, Yan Wen, Fushuan Zhang, Can Xue, Yusheng Optimal skeleton-network restoration considering generator start-up sequence and load pickup |
title | Optimal skeleton-network restoration considering generator start-up sequence and load pickup |
title_full | Optimal skeleton-network restoration considering generator start-up sequence and load pickup |
title_fullStr | Optimal skeleton-network restoration considering generator start-up sequence and load pickup |
title_full_unstemmed | Optimal skeleton-network restoration considering generator start-up sequence and load pickup |
title_short | Optimal skeleton-network restoration considering generator start-up sequence and load pickup |
title_sort | optimal skeleton network restoration considering generator start up sequence and load pickup |
topic | Engineering::Electrical and electronic engineering System Restoration Black Start |
url | https://hdl.handle.net/10356/141192 |
work_keys_str_mv | AT sunlei optimalskeletonnetworkrestorationconsideringgeneratorstartupsequenceandloadpickup AT linzhenzhi optimalskeletonnetworkrestorationconsideringgeneratorstartupsequenceandloadpickup AT xuyan optimalskeletonnetworkrestorationconsideringgeneratorstartupsequenceandloadpickup AT wenfushuan optimalskeletonnetworkrestorationconsideringgeneratorstartupsequenceandloadpickup AT zhangcan optimalskeletonnetworkrestorationconsideringgeneratorstartupsequenceandloadpickup AT xueyusheng optimalskeletonnetworkrestorationconsideringgeneratorstartupsequenceandloadpickup |