Harnessing Building Information Modelling (BIM) tools capabilities to enhance project productivity
Quantity take-off (QTO) is an essential process in construction cost estimation process and play an important role in enabling a project to be completed within the targeted duration and budget. Traditionally, QTO is done manually by the Quantity Surveyors (QS) or cost engineers based on 2D drawings....
Main Author: | Lim, Zhi Ying |
---|---|
Other Authors: | Teoh Bak Koon |
Format: | Final Year Project (FYP) |
Language: | English |
Published: |
Nanyang Technological University
2020
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/145420 |
Similar Items
-
The application of building information modelling (BIM) on construction productivity
by: Zhang, Cheng Long
Published: (2015) -
A Relationship Framework for Building Information Modeling (BIM) Capability in Quantity Surveying Practice and Project Performance
by: Wong, P.F., et al.
Published: (2015) -
Challanges of building information modelling (BIM) in project implementation
by: Loh, Mei Yee
Published: (2014) -
A study on solutions to exchange the building projects data between BIM platforms
by: Kock, Ming Tai
Published: (2018) -
Integration of building information modelling (BIM) with materials management in construction project
by: Fayed Mogalli, Ali Hussein
Published: (2017)