Evaluation of the impacts of the bus dispatching headway on multi-bus line operation system

This project aims to use the traffic simulation software, Eclipse SUMO to simulate public and private transportation services, specifically buses and shuttles, to study the effects of multiple bus systems implemented on the same route and implement python scripts as a possible solution.

Bibliographic Details
Main Author: Mohamad Aqil Izzuddin Mohamad Azini
Other Authors: Su Rong
Format: Final Year Project (FYP)
Language:English
Published: Nanyang Technological University 2021
Subjects:
Online Access:https://hdl.handle.net/10356/149053
_version_ 1826126316893634560
author Mohamad Aqil Izzuddin Mohamad Azini
author2 Su Rong
author_facet Su Rong
Mohamad Aqil Izzuddin Mohamad Azini
author_sort Mohamad Aqil Izzuddin Mohamad Azini
collection NTU
description This project aims to use the traffic simulation software, Eclipse SUMO to simulate public and private transportation services, specifically buses and shuttles, to study the effects of multiple bus systems implemented on the same route and implement python scripts as a possible solution.
first_indexed 2024-10-01T06:50:43Z
format Final Year Project (FYP)
id ntu-10356/149053
institution Nanyang Technological University
language English
last_indexed 2024-10-01T06:50:43Z
publishDate 2021
publisher Nanyang Technological University
record_format dspace
spelling ntu-10356/1490532023-07-07T17:20:28Z Evaluation of the impacts of the bus dispatching headway on multi-bus line operation system Mohamad Aqil Izzuddin Mohamad Azini Su Rong School of Electrical and Electronic Engineering RSu@ntu.edu.sg Engineering::Electrical and electronic engineering This project aims to use the traffic simulation software, Eclipse SUMO to simulate public and private transportation services, specifically buses and shuttles, to study the effects of multiple bus systems implemented on the same route and implement python scripts as a possible solution. Bachelor of Engineering (Electrical and Electronic Engineering) 2021-05-25T02:33:58Z 2021-05-25T02:33:58Z 2021 Final Year Project (FYP) Mohamad Aqil Izzuddin Mohamad Azini (2021). Evaluation of the impacts of the bus dispatching headway on multi-bus line operation system. Final Year Project (FYP), Nanyang Technological University, Singapore. https://hdl.handle.net/10356/149053 https://hdl.handle.net/10356/149053 en A1130-201 application/pdf Nanyang Technological University
spellingShingle Engineering::Electrical and electronic engineering
Mohamad Aqil Izzuddin Mohamad Azini
Evaluation of the impacts of the bus dispatching headway on multi-bus line operation system
title Evaluation of the impacts of the bus dispatching headway on multi-bus line operation system
title_full Evaluation of the impacts of the bus dispatching headway on multi-bus line operation system
title_fullStr Evaluation of the impacts of the bus dispatching headway on multi-bus line operation system
title_full_unstemmed Evaluation of the impacts of the bus dispatching headway on multi-bus line operation system
title_short Evaluation of the impacts of the bus dispatching headway on multi-bus line operation system
title_sort evaluation of the impacts of the bus dispatching headway on multi bus line operation system
topic Engineering::Electrical and electronic engineering
url https://hdl.handle.net/10356/149053
work_keys_str_mv AT mohamadaqilizzuddinmohamadazini evaluationoftheimpactsofthebusdispatchingheadwayonmultibuslineoperationsystem