A development on the integration of BIM with RFID to improve the precast logistic management and installation system

Singapore’s Construction industry has been constantly improving over the years. The adaptation of many technologies has been made to advance forward. The objective of the research is to study the efficiency in precast logistic management and installation. Comparison between past project information...

Full description

Bibliographic Details
Main Author: Lee, Bernice Ser Li
Other Authors: Tiong Lee Kong, Robert
Format: Final Year Project (FYP)
Language:English
Published: Nanyang Technological University 2021
Subjects:
Online Access:https://hdl.handle.net/10356/150097
_version_ 1811677053464870912
author Lee, Bernice Ser Li
author2 Tiong Lee Kong, Robert
author_facet Tiong Lee Kong, Robert
Lee, Bernice Ser Li
author_sort Lee, Bernice Ser Li
collection NTU
description Singapore’s Construction industry has been constantly improving over the years. The adaptation of many technologies has been made to advance forward. The objective of the research is to study the efficiency in precast logistic management and installation. Comparison between past project information and future predictions have been made to further improve the existing programme integrating BIM with RFID in the precast manufacturing chain. By analysing past data, background interface and data sheet formats, the aim of this study to improve the overall workflow in precast construction. This would allow the programme to be more versatile in adapting many types of precast construction projects. The development of a generic system for process workflow has been set up. This project proposes to develop a system that would benefit future implementation through all workflow in construction projects. The setting up of a generic labelling system have been implemented as well as new data sheet formats to improve the interface within the cloud base platform. In addition, a webpage has been developed to aid the management system and conclude all the work processes and data. Accessing from the management level down to the worker level, laborious processes have been streamlined to benefit the system. This would aid the management level and make processes simpler for all key personnel in a project.
first_indexed 2024-10-01T02:31:15Z
format Final Year Project (FYP)
id ntu-10356/150097
institution Nanyang Technological University
language English
last_indexed 2024-10-01T02:31:15Z
publishDate 2021
publisher Nanyang Technological University
record_format dspace
spelling ntu-10356/1500972021-05-21T07:21:49Z A development on the integration of BIM with RFID to improve the precast logistic management and installation system Lee, Bernice Ser Li Tiong Lee Kong, Robert School of Civil and Environmental Engineering CLKTIONG@ntu.edu.sg Engineering::Civil engineering Singapore’s Construction industry has been constantly improving over the years. The adaptation of many technologies has been made to advance forward. The objective of the research is to study the efficiency in precast logistic management and installation. Comparison between past project information and future predictions have been made to further improve the existing programme integrating BIM with RFID in the precast manufacturing chain. By analysing past data, background interface and data sheet formats, the aim of this study to improve the overall workflow in precast construction. This would allow the programme to be more versatile in adapting many types of precast construction projects. The development of a generic system for process workflow has been set up. This project proposes to develop a system that would benefit future implementation through all workflow in construction projects. The setting up of a generic labelling system have been implemented as well as new data sheet formats to improve the interface within the cloud base platform. In addition, a webpage has been developed to aid the management system and conclude all the work processes and data. Accessing from the management level down to the worker level, laborious processes have been streamlined to benefit the system. This would aid the management level and make processes simpler for all key personnel in a project. Bachelor of Engineering (Civil) 2021-05-21T07:21:49Z 2021-05-21T07:21:49Z 2021 Final Year Project (FYP) Lee, B. S. L. (2021). A development on the integration of BIM with RFID to improve the precast logistic management and installation system. Final Year Project (FYP), Nanyang Technological University, Singapore. https://hdl.handle.net/10356/150097 https://hdl.handle.net/10356/150097 en application/pdf Nanyang Technological University
spellingShingle Engineering::Civil engineering
Lee, Bernice Ser Li
A development on the integration of BIM with RFID to improve the precast logistic management and installation system
title A development on the integration of BIM with RFID to improve the precast logistic management and installation system
title_full A development on the integration of BIM with RFID to improve the precast logistic management and installation system
title_fullStr A development on the integration of BIM with RFID to improve the precast logistic management and installation system
title_full_unstemmed A development on the integration of BIM with RFID to improve the precast logistic management and installation system
title_short A development on the integration of BIM with RFID to improve the precast logistic management and installation system
title_sort development on the integration of bim with rfid to improve the precast logistic management and installation system
topic Engineering::Civil engineering
url https://hdl.handle.net/10356/150097
work_keys_str_mv AT leeberniceserli adevelopmentontheintegrationofbimwithrfidtoimprovetheprecastlogisticmanagementandinstallationsystem
AT leeberniceserli developmentontheintegrationofbimwithrfidtoimprovetheprecastlogisticmanagementandinstallationsystem