Engineering pressure retarded osmosis membrane bioreactor (PRO-MBR) for simultaneous water and energy recovery from municipal wastewater
Osmotic membrane bioreactors (OMBR) have gained increasing interest in wastewater treatment and reclamation due to their high product water quality and fouling resistance. However, high energy consumption (mostly by draw solution recovery) restricted the wider application of OMBR. Herein, we propose...
Main Authors: | Liu, Shuyue, Song, Weilong, Meng, Manli, Xie, Ming, She, Qianhong, Zhao, Pin, Wang, Xinhua |
---|---|
Other Authors: | School of Civil and Environmental Engineering |
Format: | Journal Article |
Language: | English |
Published: |
2023
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/164193 |
Similar Items
-
Membrane structure-dependent limiting flux behavior and membrane selectivity loss during gypsum scaling : implications for pressure-retarded osmosis operation and membrane design
by: Fei, Jingyuan, et al.
Published: (2021) -
Membrane compaction in forward osmosis process
by: Ng, Daniel Yee Fan, et al.
Published: (2021) -
Induced-charge electro-osmosis
by: Squires, Todd M., et al.
Published: (2005) -
Energy-efficient desalination by forward osmosis using responsive ionic liquid draw solutes
by: Cai, Yufeng, et al.
Published: (2016) -
Exploring the limitations of osmotically assisted reverse osmosis: membrane fouling and the limiting flux
by: Peters, Christian D., et al.
Published: (2022)