Bankline abutment scour in compound channels
This paper presents the results of bed scouring near an abutment that spans the entire floodplain width and terminates at the edge of the main channel, termed here as the bankline abutment. The cross section can be divided into a scoured section and an un-scoured section. The scoured bed profile can...
Main Authors: | Abdelaziz, Ahmed A., Lim, Siow Yong, Kim, Jong R. |
---|---|
Other Authors: | School of Civil and Environmental Engineering |
Format: | Journal Article |
Language: | English |
Published: |
2024
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/179756 |
Similar Items
-
Migration of maximum scour location around wide setback bridge abutments in floodplains
by: Ahmed Abouelfetouh Abdelaziz, et al.
Published: (2022) -
Modeling of clear-water contraction scour for an abutment bridge in a compound channel
by: Ghazvinei, Pezhman Taherei
Published: (2014) -
Combination of riprap and submerged vane as an abutment scour countermeasure
by: Fathi, Abazar, et al.
Published: (2023) -
Localized scour around setback abutment in compound channel
by: Ahmed Abouelfetouh Abdelaziz Mohamed Younes
Published: (2019) -
Effect of abutment width on scour hole characteristics around abutment in compound channel
by: Lian, Lian
Published: (2017)