Smart multi-project scheduling and multi-skilled workforce assignment for prefabricated bathroom unit production
This paper addresses low worker productivity in Prefabricated Bathroom Unit (PBU) production. To improve, a hierarchical two-level model is developed to (1) integrate project scheduling and task assignments, (2) incorporate multi-skilled workers at an individual level with heterogeneous skill scopes...
Main Authors: | Han, Jinchi, Chen, Chen, Tiong, Robert Lee Kong, Wu, Kan |
---|---|
Other Authors: | School of Civil and Environmental Engineering |
Format: | Journal Article |
Language: | English |
Published: |
2024
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/180828 |
Similar Items
-
Using a genetic algorithm to schedule the space-constrained AGV-based prefabricated bathroom units manufacturing system
by: Tiong, Lee Kong, et al.
Published: (2019) -
Comparison of metaheuristic optimization algorithms for solving constrained mechanical design optimization problems
by: Gupta, Shubham, et al.
Published: (2022) -
Resource scheduling techniques optimization using cuckoo search based algorithm for cloud computing
by: Madni, Syed Hamid Hussain
Published: (2024) -
Multiple individual guided differential evolution with time varying and feedback information-based control parameters
by: Gupta, Shubham, et al.
Published: (2023) -
Preparing the Advanced Manufacturing Workforce: A Study of Occupation and Skills Demand in the Photonics Industry
by: Kirchain, Randolph, et al.
Published: (2022)