Displacement of MRT tunnels due to an adjacent excavation
A large excavation of approximately 140m wide and 200m long was required at the proposed Tan Tock Seng Hospital site in Singapore for the construction of a 15m deep basement. The excavation is close to 2 nos. of Mass Rapid Transit (MRT) tunnels of 6m diameter. The reduced levels (RL) of the tunnels...
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19445 |