Speed and economy in highrise construction

This report presents the findings of a study undertaken by the writer to examine the best construction methods (or systems), materials and the structural designs that help to speed up the construction of tall buildings. This structural system and equipment also provide the maximum rentable floor are...

Fuld beskrivelse

Bibliografiske detaljer
Hovedforfatter: Chua, Kok Seng.
Andre forfattere: Alum, Jahidul
Format: Thesis
Sprog:English
Udgivet: 2009
Fag:
Online adgang:http://hdl.handle.net/10356/19472
Beskrivelse
Summary:This report presents the findings of a study undertaken by the writer to examine the best construction methods (or systems), materials and the structural designs that help to speed up the construction of tall buildings. This structural system and equipment also provide the maximum rentable floor areas with plenty of headroom for services, reduce the construction cost and shorten construction time.