Speed and economy in highrise construction

This report presents the findings of a study undertaken by the writer to examine the best construction methods (or systems), materials and the structural designs that help to speed up the construction of tall buildings. This structural system and equipment also provide the maximum rentable floor are...

Full description

Bibliographic Details
Main Author: Chua, Kok Seng.
Other Authors: Alum, Jahidul
Format: Thesis
Language:English
Published: 2009
Subjects:
Online Access:http://hdl.handle.net/10356/19472
_version_ 1811683728885284864
author Chua, Kok Seng.
author2 Alum, Jahidul
author_facet Alum, Jahidul
Chua, Kok Seng.
author_sort Chua, Kok Seng.
collection NTU
description This report presents the findings of a study undertaken by the writer to examine the best construction methods (or systems), materials and the structural designs that help to speed up the construction of tall buildings. This structural system and equipment also provide the maximum rentable floor areas with plenty of headroom for services, reduce the construction cost and shorten construction time.
first_indexed 2024-10-01T04:17:21Z
format Thesis
id ntu-10356/19472
institution Nanyang Technological University
language English
last_indexed 2024-10-01T04:17:21Z
publishDate 2009
record_format dspace
spelling ntu-10356/194722020-09-26T21:16:27Z Speed and economy in highrise construction Chua, Kok Seng. Alum, Jahidul Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Construction management This report presents the findings of a study undertaken by the writer to examine the best construction methods (or systems), materials and the structural designs that help to speed up the construction of tall buildings. This structural system and equipment also provide the maximum rentable floor areas with plenty of headroom for services, reduce the construction cost and shorten construction time. Master of Science (International Construction Management) 2009-12-11T09:18:45Z 2009-12-11T09:18:45Z 1996 1996 Thesis http://hdl.handle.net/10356/19472 en NANYANG TECHNOLOGICAL UNIVERSITY 131 p. application/pdf
spellingShingle DRNTU::Engineering::Civil engineering::Construction management
Chua, Kok Seng.
Speed and economy in highrise construction
title Speed and economy in highrise construction
title_full Speed and economy in highrise construction
title_fullStr Speed and economy in highrise construction
title_full_unstemmed Speed and economy in highrise construction
title_short Speed and economy in highrise construction
title_sort speed and economy in highrise construction
topic DRNTU::Engineering::Civil engineering::Construction management
url http://hdl.handle.net/10356/19472
work_keys_str_mv AT chuakokseng speedandeconomyinhighriseconstruction