Project management for design and build residential projects
This report describes a study on project management for design and build residential projects. Two projects awarded under the JCT form of design and build contract and five projects awarded under the traditional form of SIA lump sum contract were used as case studies. It is claimed that fast-track c...
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19479 |
_version_ | 1811695319388258304 |
---|---|
author | Low, McDonald Hoong Chiong. |
author2 | Yip, Woon Kwong |
author_facet | Yip, Woon Kwong Low, McDonald Hoong Chiong. |
author_sort | Low, McDonald Hoong Chiong. |
collection | NTU |
description | This report describes a study on project management for design and build residential projects. Two projects awarded under the JCT form of design and build contract and five projects awarded under the traditional form of SIA lump sum contract were used as case studies. It is claimed that fast-track construction, acceptable quality and cost competitiveness are achievable in design and build residential projects. A comparison is made between projects awarded under the two different form of contracts. |
first_indexed | 2024-10-01T07:21:35Z |
format | Thesis |
id | ntu-10356/19479 |
institution | Nanyang Technological University |
language | English |
last_indexed | 2024-10-01T07:21:35Z |
publishDate | 2009 |
record_format | dspace |
spelling | ntu-10356/194792020-09-26T21:20:35Z Project management for design and build residential projects Low, McDonald Hoong Chiong. Yip, Woon Kwong Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Construction management This report describes a study on project management for design and build residential projects. Two projects awarded under the JCT form of design and build contract and five projects awarded under the traditional form of SIA lump sum contract were used as case studies. It is claimed that fast-track construction, acceptable quality and cost competitiveness are achievable in design and build residential projects. A comparison is made between projects awarded under the two different form of contracts. Master of Science (International Construction Management) 2009-12-11T09:19:10Z 2009-12-11T09:19:10Z 1996 1996 Thesis http://hdl.handle.net/10356/19479 en NANYANG TECHNOLOGICAL UNIVERSITY 174 p. application/pdf |
spellingShingle | DRNTU::Engineering::Civil engineering::Construction management Low, McDonald Hoong Chiong. Project management for design and build residential projects |
title | Project management for design and build residential projects |
title_full | Project management for design and build residential projects |
title_fullStr | Project management for design and build residential projects |
title_full_unstemmed | Project management for design and build residential projects |
title_short | Project management for design and build residential projects |
title_sort | project management for design and build residential projects |
topic | DRNTU::Engineering::Civil engineering::Construction management |
url | http://hdl.handle.net/10356/19479 |
work_keys_str_mv | AT lowmcdonaldhoongchiong projectmanagementfordesignandbuildresidentialprojects |