Construction management of temporary works
Temporary works have usually been viewed as an ancillary to the main structural and architectural works. Inadequate emphasis is given to temporary works. More often than not, the temporary works have been intentionally or unintentionally neglected. This is not a desirable outlook as temporary works...
Main Authors: | Ang, Boon Yee, Chen, Kheng Seong |
---|---|
Other Authors: | Lim, Ewe Chye |
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19491 |
Similar Items
-
Construction design management in the Singapore construction industry
by: Ling, Boon Kok.
Published: (2008) -
Study on aspects of total quality management in Singapore construction industry
by: Ang, Sim Ai
Published: (2011) -
Proposed redevelopment of existing buildings with enhanced plot ratio
by: Lim, Boon Kheng.
Published: (2008) -
Study on loss and expense claims arising from variation orders using public sector standard conditions of contract for construction works
by: Chan, Sock Yee.
Published: (2008) -
A study of productivity and buildability in the construction industry
by: Tan, Boon Leong.
Published: (2009)