Scheduling and control of flexible manufacturing systems

The scheduling and control problems of a flexible manufacturing system (FMS) are very important considerations if one is to improve the performance of the system with a given system design. FMS scheduling is known to be a complex problem because of the flexibility and automation of the production en...

Full description

Bibliographic Details
Main Author: Meng, Jin Yan
Other Authors: Soh, Yeng Chai
Format: Thesis
Language:English
Published: 2009
Subjects:
Online Access:http://hdl.handle.net/10356/19673
_version_ 1811678218999037952
author Meng, Jin Yan
author2 Soh, Yeng Chai
author_facet Soh, Yeng Chai
Meng, Jin Yan
author_sort Meng, Jin Yan
collection NTU
description The scheduling and control problems of a flexible manufacturing system (FMS) are very important considerations if one is to improve the performance of the system with a given system design. FMS scheduling is known to be a complex problem because of the flexibility and automation of the production environment, dynamic changes of systems and orders, and dynamic decision requirements. It is a challenging task to obtain a good feasible solution to an FMS scheduling problem.
first_indexed 2024-10-01T02:49:47Z
format Thesis
id ntu-10356/19673
institution Nanyang Technological University
language English
last_indexed 2024-10-01T02:49:47Z
publishDate 2009
record_format dspace
spelling ntu-10356/196732023-07-04T15:23:18Z Scheduling and control of flexible manufacturing systems Meng, Jin Yan Soh, Yeng Chai School of Electrical and Electronic Engineering DRNTU::Engineering::Manufacturing::Flexible manufacturing systems The scheduling and control problems of a flexible manufacturing system (FMS) are very important considerations if one is to improve the performance of the system with a given system design. FMS scheduling is known to be a complex problem because of the flexibility and automation of the production environment, dynamic changes of systems and orders, and dynamic decision requirements. It is a challenging task to obtain a good feasible solution to an FMS scheduling problem. Master of Engineering 2009-12-14T06:21:00Z 2009-12-14T06:21:00Z 1995 1995 Thesis http://hdl.handle.net/10356/19673 en NANYANG TECHNOLOGICAL UNIVERSITY 144 p. application/pdf
spellingShingle DRNTU::Engineering::Manufacturing::Flexible manufacturing systems
Meng, Jin Yan
Scheduling and control of flexible manufacturing systems
title Scheduling and control of flexible manufacturing systems
title_full Scheduling and control of flexible manufacturing systems
title_fullStr Scheduling and control of flexible manufacturing systems
title_full_unstemmed Scheduling and control of flexible manufacturing systems
title_short Scheduling and control of flexible manufacturing systems
title_sort scheduling and control of flexible manufacturing systems
topic DRNTU::Engineering::Manufacturing::Flexible manufacturing systems
url http://hdl.handle.net/10356/19673
work_keys_str_mv AT mengjinyan schedulingandcontrolofflexiblemanufacturingsystems