Scheduling and control of flexible manufacturing systems
The scheduling and control problems of a flexible manufacturing system (FMS) are very important considerations if one is to improve the performance of the system with a given system design. FMS scheduling is known to be a complex problem because of the flexibility and automation of the production en...
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19673 |
_version_ | 1811678218999037952 |
---|---|
author | Meng, Jin Yan |
author2 | Soh, Yeng Chai |
author_facet | Soh, Yeng Chai Meng, Jin Yan |
author_sort | Meng, Jin Yan |
collection | NTU |
description | The scheduling and control problems of a flexible manufacturing system (FMS) are very important considerations if one is to improve the performance of the system with a given system design. FMS scheduling is known to be a complex problem because of the flexibility and automation of the production environment, dynamic changes of systems and orders, and dynamic decision requirements. It is a challenging task to obtain a good feasible solution to an FMS scheduling problem. |
first_indexed | 2024-10-01T02:49:47Z |
format | Thesis |
id | ntu-10356/19673 |
institution | Nanyang Technological University |
language | English |
last_indexed | 2024-10-01T02:49:47Z |
publishDate | 2009 |
record_format | dspace |
spelling | ntu-10356/196732023-07-04T15:23:18Z Scheduling and control of flexible manufacturing systems Meng, Jin Yan Soh, Yeng Chai School of Electrical and Electronic Engineering DRNTU::Engineering::Manufacturing::Flexible manufacturing systems The scheduling and control problems of a flexible manufacturing system (FMS) are very important considerations if one is to improve the performance of the system with a given system design. FMS scheduling is known to be a complex problem because of the flexibility and automation of the production environment, dynamic changes of systems and orders, and dynamic decision requirements. It is a challenging task to obtain a good feasible solution to an FMS scheduling problem. Master of Engineering 2009-12-14T06:21:00Z 2009-12-14T06:21:00Z 1995 1995 Thesis http://hdl.handle.net/10356/19673 en NANYANG TECHNOLOGICAL UNIVERSITY 144 p. application/pdf |
spellingShingle | DRNTU::Engineering::Manufacturing::Flexible manufacturing systems Meng, Jin Yan Scheduling and control of flexible manufacturing systems |
title | Scheduling and control of flexible manufacturing systems |
title_full | Scheduling and control of flexible manufacturing systems |
title_fullStr | Scheduling and control of flexible manufacturing systems |
title_full_unstemmed | Scheduling and control of flexible manufacturing systems |
title_short | Scheduling and control of flexible manufacturing systems |
title_sort | scheduling and control of flexible manufacturing systems |
topic | DRNTU::Engineering::Manufacturing::Flexible manufacturing systems |
url | http://hdl.handle.net/10356/19673 |
work_keys_str_mv | AT mengjinyan schedulingandcontrolofflexiblemanufacturingsystems |