A knowledge-based job scheduler
Two main resources are involved in a calibration process, they are calibration officer and reference equipment. In order to optimise and co-ordinate the use of these resources, scheduling are required. At the moment, these resources are manually scheduled by the process planner. The disadvantages ar...
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/19941 |
_version_ | 1811686150868303872 |
---|---|
author | Ho, Yik Hwee. |
author2 | Seow, Yit Yuee |
author_facet | Seow, Yit Yuee Ho, Yik Hwee. |
author_sort | Ho, Yik Hwee. |
collection | NTU |
description | Two main resources are involved in a calibration process, they are calibration officer and reference equipment. In order to optimise and co-ordinate the use of these resources, scheduling are required. At the moment, these resources are manually scheduled by the process planner. The disadvantages are time consuming, tedious, heavy reliance on experience and memory of the process planner, difficulty in maintaining consistency in editing practices and sub-optimisation of the use of resources. |
first_indexed | 2024-10-01T04:55:51Z |
format | Thesis |
id | ntu-10356/19941 |
institution | Nanyang Technological University |
language | English |
last_indexed | 2024-10-01T04:55:51Z |
publishDate | 2009 |
record_format | dspace |
spelling | ntu-10356/199412023-03-11T16:55:21Z A knowledge-based job scheduler Ho, Yik Hwee. Seow, Yit Yuee School of Mechanical and Production Engineering DRNTU::Engineering::Industrial engineering::Managerial control systems Two main resources are involved in a calibration process, they are calibration officer and reference equipment. In order to optimise and co-ordinate the use of these resources, scheduling are required. At the moment, these resources are manually scheduled by the process planner. The disadvantages are time consuming, tedious, heavy reliance on experience and memory of the process planner, difficulty in maintaining consistency in editing practices and sub-optimisation of the use of resources. Master of Science (Computer Integrated Manufacturing) 2009-12-14T07:52:24Z 2009-12-14T07:52:24Z 1997 1997 Thesis http://hdl.handle.net/10356/19941 en NANYANG TECHNOLOGICAL UNIVERSITY 195 p. application/pdf |
spellingShingle | DRNTU::Engineering::Industrial engineering::Managerial control systems Ho, Yik Hwee. A knowledge-based job scheduler |
title | A knowledge-based job scheduler |
title_full | A knowledge-based job scheduler |
title_fullStr | A knowledge-based job scheduler |
title_full_unstemmed | A knowledge-based job scheduler |
title_short | A knowledge-based job scheduler |
title_sort | knowledge based job scheduler |
topic | DRNTU::Engineering::Industrial engineering::Managerial control systems |
url | http://hdl.handle.net/10356/19941 |
work_keys_str_mv | AT hoyikhwee aknowledgebasedjobscheduler AT hoyikhwee knowledgebasedjobscheduler |