Managing change issues in business process re-engineering projects : a case study at Tan Tock Seng Hospital to identify implementation guidelines.
Managing change is the hardest part of BPR projects. It traversed cultural, political and personal boundaries and its tasks can be easily underestimated. It touches the fundamental of who, what and why things are done at the workplace and opens up a new paradigmatic mindset to re-examine business pr...
Main Author: | Ng, Jonathan Hock Siang. |
---|---|
Other Authors: | Neo, Boon Siong |
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/20072 |
Similar Items
-
Hip and prosthetic dislocation presenting to emergency department of Tan Tock Seng Hospital
by: Tan, Xuan Hao
Published: (2017) -
The Pauper Hospital - Tan Tock Seng Hospital as a Benevolent Institute and a tool of the empire
by: Lee, Justin Jia Cheng
Published: (2024) -
RFID based asset tracking system : case study of Tan Tock Seng Hospital
by: Tan, Shi Wei.
Published: (2012) -
Global product development in semiconductor industry : Intel -- Tick-Tock product development cadence
by: Park, Cheolmin, 1970-
Published: (2008) -
Individual Field Project Guideline – Bachelor of Business Engineering with Honours
by: Lee, Khai Loon, et al.
Published: (2020)