Implementation of a simulation-based scheduling system in a semi-conductor backend assembly line
This thesis shows the implementation of a simulation-based scheduling system in a semi-conductor backend assembly line. It gives a brief introduction of IC manufacturing processes from wafer fabrication to backend assembly and test. It looks into the limitation of the current production planning...
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Language: | English |
Published: |
2009
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/20539 |
_version_ | 1811696985180209152 |
---|---|
author | Liew, Yuk Kong. |
author2 | Anirudha, Sen |
author_facet | Anirudha, Sen Liew, Yuk Kong. |
author_sort | Liew, Yuk Kong. |
collection | NTU |
description | This thesis shows the implementation of a simulation-based scheduling
system in a semi-conductor backend assembly line. It gives a brief introduction
of IC manufacturing processes from wafer fabrication to backend assembly and
test. It looks into the limitation of the current production planning and control
systems and the rationality for a finite capacity simulation-based scheduling
system. |
first_indexed | 2024-10-01T07:48:03Z |
format | Thesis |
id | ntu-10356/20539 |
institution | Nanyang Technological University |
language | English |
last_indexed | 2024-10-01T07:48:03Z |
publishDate | 2009 |
record_format | dspace |
spelling | ntu-10356/205392020-09-26T22:14:11Z Implementation of a simulation-based scheduling system in a semi-conductor backend assembly line Liew, Yuk Kong. Anirudha, Sen Gintic Institute of Manufacturing Technology DRNTU::Engineering::Manufacturing::Production management This thesis shows the implementation of a simulation-based scheduling system in a semi-conductor backend assembly line. It gives a brief introduction of IC manufacturing processes from wafer fabrication to backend assembly and test. It looks into the limitation of the current production planning and control systems and the rationality for a finite capacity simulation-based scheduling system. Master of Science (Computer Integrated Manufacturing) 2009-12-15T03:17:32Z 2009-12-15T03:17:32Z 1996 1996 Thesis http://hdl.handle.net/10356/20539 en NANYANG TECHNOLOGICAL UNIVERSITY 142 p. application/pdf |
spellingShingle | DRNTU::Engineering::Manufacturing::Production management Liew, Yuk Kong. Implementation of a simulation-based scheduling system in a semi-conductor backend assembly line |
title | Implementation of a simulation-based scheduling system in a semi-conductor backend assembly line |
title_full | Implementation of a simulation-based scheduling system in a semi-conductor backend assembly line |
title_fullStr | Implementation of a simulation-based scheduling system in a semi-conductor backend assembly line |
title_full_unstemmed | Implementation of a simulation-based scheduling system in a semi-conductor backend assembly line |
title_short | Implementation of a simulation-based scheduling system in a semi-conductor backend assembly line |
title_sort | implementation of a simulation based scheduling system in a semi conductor backend assembly line |
topic | DRNTU::Engineering::Manufacturing::Production management |
url | http://hdl.handle.net/10356/20539 |
work_keys_str_mv | AT liewyukkong implementationofasimulationbasedschedulingsysteminasemiconductorbackendassemblyline |