Plant maintenance system
This report is divided into four sections, “Introduction”, “Project Plan”, “Proposed Solution”, and “Conclusion”. “Project Plan” and “Proposed Solution” form the main bulk of the report. The “Project Plan” gives a brief overview of the company background and its existing problems. This section al...
Main Authors: | , , |
---|---|
Other Authors: | |
Format: | Final Year Project (FYP) |
Language: | English |
Published: |
2010
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/21212 |
_version_ | 1826115823358443520 |
---|---|
author | Lee, Carmen Mun Yi Lim, Yijin Neha Saoji |
author2 | Damien Joseph |
author_facet | Damien Joseph Lee, Carmen Mun Yi Lim, Yijin Neha Saoji |
author_sort | Lee, Carmen Mun Yi |
collection | NTU |
description | This report is divided into four sections, “Introduction”, “Project Plan”, “Proposed Solution”,
and “Conclusion”. “Project Plan” and “Proposed Solution” form the main bulk of the report.
The “Project Plan” gives a brief overview of the company background and its existing
problems. This section also contains other information such as the scope, tasks and criteria of success, etc. of the project.
The “Proposed Solution” section goes through the steps that the group have undergone in order to arrive at the proposed solution. This section includes three steps of analysis namely the problem, requirements and feasibility analysis, which will be followed by the logical design
and physical design of the proposed system.
Finally, this report will conclude with an evaluation of the group’s recommendations and a summary of how the information system can add value to KB Associates Pte Ltd. |
first_indexed | 2024-10-01T04:01:27Z |
format | Final Year Project (FYP) |
id | ntu-10356/21212 |
institution | Nanyang Technological University |
language | English |
last_indexed | 2024-10-01T04:01:27Z |
publishDate | 2010 |
record_format | dspace |
spelling | ntu-10356/212122023-05-19T06:08:58Z Plant maintenance system Lee, Carmen Mun Yi Lim, Yijin Neha Saoji Damien Joseph Nanyang Business School KB Associates Pte Ltd DRNTU::Business::Operations management This report is divided into four sections, “Introduction”, “Project Plan”, “Proposed Solution”, and “Conclusion”. “Project Plan” and “Proposed Solution” form the main bulk of the report. The “Project Plan” gives a brief overview of the company background and its existing problems. This section also contains other information such as the scope, tasks and criteria of success, etc. of the project. The “Proposed Solution” section goes through the steps that the group have undergone in order to arrive at the proposed solution. This section includes three steps of analysis namely the problem, requirements and feasibility analysis, which will be followed by the logical design and physical design of the proposed system. Finally, this report will conclude with an evaluation of the group’s recommendations and a summary of how the information system can add value to KB Associates Pte Ltd. BUSINESS 2010-03-23T01:22:35Z 2010-03-23T01:22:35Z 2010 2010 Final Year Project (FYP) http://hdl.handle.net/10356/21212 en Nanyang Technological University 89 p. application/pdf |
spellingShingle | DRNTU::Business::Operations management Lee, Carmen Mun Yi Lim, Yijin Neha Saoji Plant maintenance system |
title | Plant maintenance system |
title_full | Plant maintenance system |
title_fullStr | Plant maintenance system |
title_full_unstemmed | Plant maintenance system |
title_short | Plant maintenance system |
title_sort | plant maintenance system |
topic | DRNTU::Business::Operations management |
url | http://hdl.handle.net/10356/21212 |
work_keys_str_mv | AT leecarmenmunyi plantmaintenancesystem AT limyijin plantmaintenancesystem AT nehasaoji plantmaintenancesystem |