Report on industrial attachment with Air System Technology (S) Pte Ltd
During the 24-weeks training, I was involved in project analysis, project management and support activities such as design and implementation, planning and site supervision and lastly, compilation of data. It entails a comprehensive job scope allowing one to be better prepared for the future. INCLUD...
Main Author: | |
---|---|
Other Authors: | |
Format: | |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/3088 |
Summary: | During the 24-weeks training, I was involved in project analysis, project management and support activities such as design and implementation, planning and site supervision and lastly, compilation of data. It entails a comprehensive job scope allowing one to be better prepared for the future. INCLUDES 2 ACCOMPANYING MATERIALS: LOGBOOK AND LOGBOOK REFERENCE. |
---|