Report on industrial attachment with Air System Technology (S) Pte Ltd

During the 24-weeks training, I was involved in project analysis, project management and support activities such as design and implementation, planning and site supervision and lastly, compilation of data. It entails a comprehensive job scope allowing one to be better prepared for the future. INCLUD...

Full description

Bibliographic Details
Main Author: Tan, Tuan Tian.
Other Authors: School of Electrical and Electronic Engineering
Format: Industrial Attachment (IA)
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/3088
_version_ 1826121629256646656
author Tan, Tuan Tian.
author2 School of Electrical and Electronic Engineering
author_facet School of Electrical and Electronic Engineering
Tan, Tuan Tian.
author_sort Tan, Tuan Tian.
collection NTU
description During the 24-weeks training, I was involved in project analysis, project management and support activities such as design and implementation, planning and site supervision and lastly, compilation of data. It entails a comprehensive job scope allowing one to be better prepared for the future. INCLUDES 2 ACCOMPANYING MATERIALS: LOGBOOK AND LOGBOOK REFERENCE.
first_indexed 2024-10-01T05:35:41Z
format Industrial Attachment (IA)
id ntu-10356/3088
institution Nanyang Technological University
last_indexed 2024-10-01T05:35:41Z
publishDate 2008
record_format dspace
spelling ntu-10356/30882023-07-07T15:46:00Z Report on industrial attachment with Air System Technology (S) Pte Ltd Tan, Tuan Tian. School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering During the 24-weeks training, I was involved in project analysis, project management and support activities such as design and implementation, planning and site supervision and lastly, compilation of data. It entails a comprehensive job scope allowing one to be better prepared for the future. INCLUDES 2 ACCOMPANYING MATERIALS: LOGBOOK AND LOGBOOK REFERENCE. 2008-09-17T09:20:22Z 2008-09-17T09:20:22Z 2005 2005 Industrial Attachment (IA) http://hdl.handle.net/10356/3088 Nanyang Technological University application/pdf
spellingShingle DRNTU::Engineering::Electrical and electronic engineering
Tan, Tuan Tian.
Report on industrial attachment with Air System Technology (S) Pte Ltd
title Report on industrial attachment with Air System Technology (S) Pte Ltd
title_full Report on industrial attachment with Air System Technology (S) Pte Ltd
title_fullStr Report on industrial attachment with Air System Technology (S) Pte Ltd
title_full_unstemmed Report on industrial attachment with Air System Technology (S) Pte Ltd
title_short Report on industrial attachment with Air System Technology (S) Pte Ltd
title_sort report on industrial attachment with air system technology s pte ltd
topic DRNTU::Engineering::Electrical and electronic engineering
url http://hdl.handle.net/10356/3088
work_keys_str_mv AT tantuantian reportonindustrialattachmentwithairsystemtechnologyspteltd