Report on industrial attachment with Singapore Telecom
Author handled three project in the attachment period: DNS problem, WAP problem and monitoring system.
Main Author: | Chen, Junhua. |
---|---|
Other Authors: | School of Electrical and Electronic Engineering |
Format: | Industrial Attachment (IA) |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/3102 |
Similar Items
-
Report on industrial attachment with Agilent Technologies Singapore
by: Jiang, Jisu
Published: (2008) -
Report on industrial attachment with Singapore Telecommunications Limited
by: Koo, Chwee Sing.
Published: (2008) -
Report on industrial attachment with Andersen Consulting Singapore
by: Loh, Christopher Meng Heng.
Published: (2008) -
Industrial attachment report at Singapore Technologies Electronics
by: Goh, Teck Han.
Published: (2008) -
Industrial attachment final report with IBM, Singapore
by: Zhang, Jian
Published: (2008)