Process control system modernization for petrochemical plant
To upgrade TDC 2000 base to TDC 3000 base Plant Solution system, introduce LCN network, UCN network and HPMM.
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/3620 |