Summary: | This survey research report contains the result of a field survey on the aspects of
Total Quality Management in the Singapore Construction Industry. An in-depth
analysis of the responses to 200 samples size of people directly involved in the
construction stage of 4 projects has been carried out and included in this report.
For ech project 25 samples were collected to sufficiently cover all parties involved
in the Construction site, namely Clients / Consultants, Main Contractors,
Subcontractors and Suppliers. For each party, approximately equal respondences
were selected to participate in the survey, i.e. , respondence from each parties or
organisation. It is envisage that this size of sample is sufficient and been
representative of the typical construction site in Singapore.
|