Risk assessment framework and modeling for underground rock construction project

This Final Year Project (FYP) Report covers the basic fundamentals of risks and risk management for an underground rock construction project, and development of a cost-benefit risk assessment framework for set-up models based on different scenarios. Despite various uncertainties involved in rock con...

Full description

Bibliographic Details
Main Author: Sirichat Vonsomtakul.
Other Authors: Tiong Lee Kong, Robert
Format: Final Year Project (FYP)
Language:English
Published: 2011
Subjects:
Online Access:http://hdl.handle.net/10356/44680
_version_ 1826123538239586304
author Sirichat Vonsomtakul.
author2 Tiong Lee Kong, Robert
author_facet Tiong Lee Kong, Robert
Sirichat Vonsomtakul.
author_sort Sirichat Vonsomtakul.
collection NTU
description This Final Year Project (FYP) Report covers the basic fundamentals of risks and risk management for an underground rock construction project, and development of a cost-benefit risk assessment framework for set-up models based on different scenarios. Despite various uncertainties involved in rock construction, there is evidence indicating that geological risk, which includes uncertainties in rock and construction types play a major role. Thus, in this project, the risk analysis framework will be built on this concept. The cost-benefit assessment will evaluate consequences on the identified risks in terms of construction time and costs. The report will start off with recognizing the increasing needs to develop a systematic risk analysis framework as an integral part of a robust risk management procedure. Then the author will explain about risk nature and risk management stages so as to provide a better understanding of overall risks, followed by the studies of construction types, rock mechanics and rock classifications. Next different risk analysis methodologies will be reviewed and the most suitable method, Monte Carlo Simulation will be selected to perform quantitative analysis on parametric studies with some assumptions according to set-up models and scenarios. The main platform used to carry out a simple Monte Carlo Simulation is Microsoft Excel which is an excellent as well as easy to understand technical tool. In addition, the data used for the simulation process is gathered from the ambiguous numbers from geologist’s consultation which include advancement rates and unit cost (in $1000). The simulation results will be generated as construction time and cost for the project which can be used at the tendering and during the on-going stage of underground construction projects. By assessing all results in given ground profiles, the best possible decisions can be made to manage risks, mitigate their negative consequences, and align with the company’s goals.
first_indexed 2024-10-01T06:06:17Z
format Final Year Project (FYP)
id ntu-10356/44680
institution Nanyang Technological University
language English
last_indexed 2024-10-01T06:06:17Z
publishDate 2011
record_format dspace
spelling ntu-10356/446802023-03-03T17:08:22Z Risk assessment framework and modeling for underground rock construction project Sirichat Vonsomtakul. Tiong Lee Kong, Robert School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering This Final Year Project (FYP) Report covers the basic fundamentals of risks and risk management for an underground rock construction project, and development of a cost-benefit risk assessment framework for set-up models based on different scenarios. Despite various uncertainties involved in rock construction, there is evidence indicating that geological risk, which includes uncertainties in rock and construction types play a major role. Thus, in this project, the risk analysis framework will be built on this concept. The cost-benefit assessment will evaluate consequences on the identified risks in terms of construction time and costs. The report will start off with recognizing the increasing needs to develop a systematic risk analysis framework as an integral part of a robust risk management procedure. Then the author will explain about risk nature and risk management stages so as to provide a better understanding of overall risks, followed by the studies of construction types, rock mechanics and rock classifications. Next different risk analysis methodologies will be reviewed and the most suitable method, Monte Carlo Simulation will be selected to perform quantitative analysis on parametric studies with some assumptions according to set-up models and scenarios. The main platform used to carry out a simple Monte Carlo Simulation is Microsoft Excel which is an excellent as well as easy to understand technical tool. In addition, the data used for the simulation process is gathered from the ambiguous numbers from geologist’s consultation which include advancement rates and unit cost (in $1000). The simulation results will be generated as construction time and cost for the project which can be used at the tendering and during the on-going stage of underground construction projects. By assessing all results in given ground profiles, the best possible decisions can be made to manage risks, mitigate their negative consequences, and align with the company’s goals. Bachelor of Engineering (Civil) 2011-06-03T01:58:32Z 2011-06-03T01:58:32Z 2011 2011 Final Year Project (FYP) http://hdl.handle.net/10356/44680 en Nanyang Technological University 120 p. application/pdf
spellingShingle DRNTU::Engineering::Civil engineering
Sirichat Vonsomtakul.
Risk assessment framework and modeling for underground rock construction project
title Risk assessment framework and modeling for underground rock construction project
title_full Risk assessment framework and modeling for underground rock construction project
title_fullStr Risk assessment framework and modeling for underground rock construction project
title_full_unstemmed Risk assessment framework and modeling for underground rock construction project
title_short Risk assessment framework and modeling for underground rock construction project
title_sort risk assessment framework and modeling for underground rock construction project
topic DRNTU::Engineering::Civil engineering
url http://hdl.handle.net/10356/44680
work_keys_str_mv AT sirichatvonsomtakul riskassessmentframeworkandmodelingforundergroundrockconstructionproject