Construction productivity of precast concrete installation on site

Construction productivity has always been a topic of keen interest among contractors in the industry, largely attributing to the fact that productivity influences costs, eventually translating to profits/losses made on a project. The use of precast concrete components in construction projects has be...

Full description

Bibliographic Details
Main Author: Ting, Darren Weiwen.
Other Authors: Tiong Lee Kong, Robert
Format: Final Year Project (FYP)
Language:English
Published: 2012
Subjects:
Online Access:http://hdl.handle.net/10356/49081
_version_ 1826118412438339584
author Ting, Darren Weiwen.
author2 Tiong Lee Kong, Robert
author_facet Tiong Lee Kong, Robert
Ting, Darren Weiwen.
author_sort Ting, Darren Weiwen.
collection NTU
description Construction productivity has always been a topic of keen interest among contractors in the industry, largely attributing to the fact that productivity influences costs, eventually translating to profits/losses made on a project. The use of precast concrete components in construction projects has been known to improve construction productivity, by means of reducing the overall number of workers required for specific tasks while improving construction time. However, little has been done to ascertain and evaluate productivity figures for precast installation on site for residential projects. Thus, this report and the research surrounding it aims to examine the factors affecting the installation cycle and present findings on typical cycle times based on conventional deterministic models. Based on the cycle times, the productivity of installation will also be measured. Cycle time is predicted by formulating equations comprising of the durations required for the installation processes that constitute to the entire cycle. In order to do so, the installation processes have to be meticulously defined for relevant data to be collected, before being factored into the formulas. With the cycle time data available, a productivity model can be developed to predict the efficiency level of the precast installations. The variables affecting both cycle times and productivity will be narrowed down in scope from a broad spectrum, and key relationships between them and the cycle time/productivity figures will be explored. The more impactful quantifiable factors are examined so that correlations can be derived for a better understanding of how they relate to one another. Through this research, it is intended that contractors can use the information as a benchmark for evaluating the efficiency of their precast installation work and even to help in the planning of work schedules.
first_indexed 2024-10-01T04:43:00Z
format Final Year Project (FYP)
id ntu-10356/49081
institution Nanyang Technological University
language English
last_indexed 2024-10-01T04:43:00Z
publishDate 2012
record_format dspace
spelling ntu-10356/490812023-03-03T16:59:09Z Construction productivity of precast concrete installation on site Ting, Darren Weiwen. Tiong Lee Kong, Robert School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering::Construction management Construction productivity has always been a topic of keen interest among contractors in the industry, largely attributing to the fact that productivity influences costs, eventually translating to profits/losses made on a project. The use of precast concrete components in construction projects has been known to improve construction productivity, by means of reducing the overall number of workers required for specific tasks while improving construction time. However, little has been done to ascertain and evaluate productivity figures for precast installation on site for residential projects. Thus, this report and the research surrounding it aims to examine the factors affecting the installation cycle and present findings on typical cycle times based on conventional deterministic models. Based on the cycle times, the productivity of installation will also be measured. Cycle time is predicted by formulating equations comprising of the durations required for the installation processes that constitute to the entire cycle. In order to do so, the installation processes have to be meticulously defined for relevant data to be collected, before being factored into the formulas. With the cycle time data available, a productivity model can be developed to predict the efficiency level of the precast installations. The variables affecting both cycle times and productivity will be narrowed down in scope from a broad spectrum, and key relationships between them and the cycle time/productivity figures will be explored. The more impactful quantifiable factors are examined so that correlations can be derived for a better understanding of how they relate to one another. Through this research, it is intended that contractors can use the information as a benchmark for evaluating the efficiency of their precast installation work and even to help in the planning of work schedules. Bachelor of Engineering (Civil) 2012-05-14T08:38:17Z 2012-05-14T08:38:17Z 2012 2012 Final Year Project (FYP) http://hdl.handle.net/10356/49081 en Nanyang Technological University 37 p. application/pdf
spellingShingle DRNTU::Engineering::Civil engineering::Construction management
Ting, Darren Weiwen.
Construction productivity of precast concrete installation on site
title Construction productivity of precast concrete installation on site
title_full Construction productivity of precast concrete installation on site
title_fullStr Construction productivity of precast concrete installation on site
title_full_unstemmed Construction productivity of precast concrete installation on site
title_short Construction productivity of precast concrete installation on site
title_sort construction productivity of precast concrete installation on site
topic DRNTU::Engineering::Civil engineering::Construction management
url http://hdl.handle.net/10356/49081
work_keys_str_mv AT tingdarrenweiwen constructionproductivityofprecastconcreteinstallationonsite