Multi-hazard risk assessment

The series of disasters following the 11 March 2011 Tohoku earthquake (Mw 9.0) is a clear example of the need of managing risks from multiple sources. These sources can be correlated or independent. For example, the disaster was characterised by the occurrence of subsequent events (i.e. earthquake,...

Full description

Bibliographic Details
Main Author: Tan, Jia Hui.
Other Authors: Kusnowidjaja Megawati
Format: Final Year Project (FYP)
Language:English
Published: 2012
Subjects:
Online Access:http://hdl.handle.net/10356/49762
_version_ 1826121887269257216
author Tan, Jia Hui.
author2 Kusnowidjaja Megawati
author_facet Kusnowidjaja Megawati
Tan, Jia Hui.
author_sort Tan, Jia Hui.
collection NTU
description The series of disasters following the 11 March 2011 Tohoku earthquake (Mw 9.0) is a clear example of the need of managing risks from multiple sources. These sources can be correlated or independent. For example, the disaster was characterised by the occurrence of subsequent events (i.e. earthquake, tsunami and nuclear risk) as well as independent events (e.g. the heavy snow and harsh weather conditions following the earthquake). The scope of this project is to analyse methods of assessing risks from multiple sources, in particular focussing on earthquake and tsunami-related events. The project will include: (1) Analysis of guidelines and literature on combinatorial risk assessment. In the past few years, there has been an increasing focus on multi-hazard risk assessment, reflected in literature but also in policy guidelines. The concept of combinatorial risk is also well known in economy, thus finance literature should be also analysed. (2) Development of a consistent statistical approach for the calculation of the combinatorial risk, including uncertainty analysis. (3) Application of the developed method to the case study in West Sumatra, Indonesia.
first_indexed 2024-10-01T05:39:30Z
format Final Year Project (FYP)
id ntu-10356/49762
institution Nanyang Technological University
language English
last_indexed 2024-10-01T05:39:30Z
publishDate 2012
record_format dspace
spelling ntu-10356/497622023-03-03T17:05:32Z Multi-hazard risk assessment Tan, Jia Hui. Kusnowidjaja Megawati School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering The series of disasters following the 11 March 2011 Tohoku earthquake (Mw 9.0) is a clear example of the need of managing risks from multiple sources. These sources can be correlated or independent. For example, the disaster was characterised by the occurrence of subsequent events (i.e. earthquake, tsunami and nuclear risk) as well as independent events (e.g. the heavy snow and harsh weather conditions following the earthquake). The scope of this project is to analyse methods of assessing risks from multiple sources, in particular focussing on earthquake and tsunami-related events. The project will include: (1) Analysis of guidelines and literature on combinatorial risk assessment. In the past few years, there has been an increasing focus on multi-hazard risk assessment, reflected in literature but also in policy guidelines. The concept of combinatorial risk is also well known in economy, thus finance literature should be also analysed. (2) Development of a consistent statistical approach for the calculation of the combinatorial risk, including uncertainty analysis. (3) Application of the developed method to the case study in West Sumatra, Indonesia. Bachelor of Engineering (Civil) 2012-05-24T02:32:39Z 2012-05-24T02:32:39Z 2012 2012 Final Year Project (FYP) http://hdl.handle.net/10356/49762 en Nanyang Technological University 52 p. application/pdf
spellingShingle DRNTU::Engineering::Civil engineering
Tan, Jia Hui.
Multi-hazard risk assessment
title Multi-hazard risk assessment
title_full Multi-hazard risk assessment
title_fullStr Multi-hazard risk assessment
title_full_unstemmed Multi-hazard risk assessment
title_short Multi-hazard risk assessment
title_sort multi hazard risk assessment
topic DRNTU::Engineering::Civil engineering
url http://hdl.handle.net/10356/49762
work_keys_str_mv AT tanjiahui multihazardriskassessment