Report on industrial attachment with Neptune Orient Lines Ltd
This industrial attachment report serves to document the author 30 weeks internship experience in Neptune Orient Lines Ltd a Singapore-based global transport company with core businesses in container shipping and supply chain management. During this internship, the author was assigned to technical s...
Main Author: | |
---|---|
Other Authors: | |
Format: | |
Language: | English |
Published: |
2012
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/50835 |
_version_ | 1826112965526421504 |
---|---|
author | Leong, Wei Wen |
author2 | Liu Yong |
author_facet | Liu Yong Leong, Wei Wen |
author_sort | Leong, Wei Wen |
collection | NTU |
description | This industrial attachment report serves to document the author 30 weeks internship experience in Neptune Orient Lines Ltd a Singapore-based global transport company with core businesses in container shipping and supply chain management. During this internship, the author was assigned to technical services department and assigned to three main projects, namely Development of Piston Ring-Pack Numerical Model, Engine Health Monitoring System for 10RTA84C and finally Simulation of Ballast water Discharge in harbours. |
first_indexed | 2024-10-01T03:15:28Z |
format | Industrial Attachment (IA) |
id | ntu-10356/50835 |
institution | Nanyang Technological University |
language | English |
last_indexed | 2024-10-01T03:15:28Z |
publishDate | 2012 |
record_format | dspace |
spelling | ntu-10356/508352023-03-04T18:14:54Z Report on industrial attachment with Neptune Orient Lines Ltd Leong, Wei Wen Liu Yong School of Mechanical and Aerospace Engineering DRNTU::Engineering::Mechanical engineering This industrial attachment report serves to document the author 30 weeks internship experience in Neptune Orient Lines Ltd a Singapore-based global transport company with core businesses in container shipping and supply chain management. During this internship, the author was assigned to technical services department and assigned to three main projects, namely Development of Piston Ring-Pack Numerical Model, Engine Health Monitoring System for 10RTA84C and finally Simulation of Ballast water Discharge in harbours. 2012-11-15T09:00:25Z 2012-11-15T09:00:25Z 2011 2011 Industrial Attachment (IA) http://hdl.handle.net/10356/50835 en Nanyang Technological University 53 p. application/pdf |
spellingShingle | DRNTU::Engineering::Mechanical engineering Leong, Wei Wen Report on industrial attachment with Neptune Orient Lines Ltd |
title | Report on industrial attachment with Neptune Orient Lines Ltd |
title_full | Report on industrial attachment with Neptune Orient Lines Ltd |
title_fullStr | Report on industrial attachment with Neptune Orient Lines Ltd |
title_full_unstemmed | Report on industrial attachment with Neptune Orient Lines Ltd |
title_short | Report on industrial attachment with Neptune Orient Lines Ltd |
title_sort | report on industrial attachment with neptune orient lines ltd |
topic | DRNTU::Engineering::Mechanical engineering |
url | http://hdl.handle.net/10356/50835 |
work_keys_str_mv | AT leongweiwen reportonindustrialattachmentwithneptuneorientlinesltd |