Report on industrial attachment with CS Bored Pile System Pte. Ltd
In this report, the author will give in depth description of the various aspects of bored piling works, from the early tendering stage to the completion of bored piling works.
Main Author: | |
---|---|
Other Authors: | |
Format: | |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/5152 |
_version_ | 1826124380071002112 |
---|---|
author | Liow, Ming Huey. |
author2 | School of Civil and Environmental Engineering |
author_facet | School of Civil and Environmental Engineering Liow, Ming Huey. |
author_sort | Liow, Ming Huey. |
collection | NTU |
description | In this report, the author will give in depth description of the various aspects of bored piling works, from the early tendering stage to the completion of bored piling works. |
first_indexed | 2024-10-01T06:19:40Z |
format | Industrial Attachment (IA) |
id | ntu-10356/5152 |
institution | Nanyang Technological University |
last_indexed | 2024-10-01T06:19:40Z |
publishDate | 2008 |
record_format | dspace |
spelling | ntu-10356/51522023-03-03T17:03:53Z Report on industrial attachment with CS Bored Pile System Pte. Ltd Liow, Ming Huey. School of Civil and Environmental Engineering DRNTU::Engineering::Civil engineering In this report, the author will give in depth description of the various aspects of bored piling works, from the early tendering stage to the completion of bored piling works. 2008-09-17T10:28:48Z 2008-09-17T10:28:48Z 2004 2004 Industrial Attachment (IA) http://hdl.handle.net/10356/5152 Nanyang Technological University 56 p. application/pdf |
spellingShingle | DRNTU::Engineering::Civil engineering Liow, Ming Huey. Report on industrial attachment with CS Bored Pile System Pte. Ltd |
title | Report on industrial attachment with CS Bored Pile System Pte. Ltd |
title_full | Report on industrial attachment with CS Bored Pile System Pte. Ltd |
title_fullStr | Report on industrial attachment with CS Bored Pile System Pte. Ltd |
title_full_unstemmed | Report on industrial attachment with CS Bored Pile System Pte. Ltd |
title_short | Report on industrial attachment with CS Bored Pile System Pte. Ltd |
title_sort | report on industrial attachment with cs bored pile system pte ltd |
topic | DRNTU::Engineering::Civil engineering |
url | http://hdl.handle.net/10356/5152 |
work_keys_str_mv | AT liowminghuey reportonindustrialattachmentwithcsboredpilesystempteltd |