Reducing simulation costs in embedded simulation in yard crane dispatching in container terminals
Computational costs of the embedded simulation in optimising algorithm with NP-hard problems are very likely to be considerable. One of the optimising algorithm that is NP-hard is YC dispatching. Thus, it is important to reduce these simulation costs in YC dispatching. In this project, we will...
Main Author: | Ong, Yi Long. |
---|---|
Other Authors: | Huang Shell Ying |
Format: | Final Year Project (FYP) |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/52795 |
Similar Items
-
A heuristic algorithm for yard crane dispatching in container terminals
by: Lee, Zhen Jie
Published: (2014) -
Reducing simulation costs of embedded simulation in yard crane dispatching in container terminals
by: Tang, Jiuyun
Published: (2015) -
Embedding simulation in yard crane dispatching to minimize job tardiness in container terminals
by: Huang, Shell Ying, et al.
Published: (2013) -
Yard crane dispatching to minimize maximum tardiness of the jobs
by: Wan, Zhi Yong
Published: (2014) -
A heuristic algorithm to schedule twin yard crane to Mmnimize job tardiness in container terminals
by: Chua, Jason Zhen Sheng
Published: (2014)