Wafer fabrication cycle time report

Wafer Fabrication Process is the starting point of making any integrated circuit (IC) products and is a complex process which goes through more than 900 operational steps before shipping for assembly and test. This makes the control of wafer fabrication process very challenging and the results can b...

Full description

Bibliographic Details
Main Author: Cheng, Hao Fen.
Other Authors: Shum Ping
Format: Final Year Project (FYP)
Language:English
Published: 2013
Subjects:
Online Access:http://hdl.handle.net/10356/54511
_version_ 1826127852654821376
author Cheng, Hao Fen.
author2 Shum Ping
author_facet Shum Ping
Cheng, Hao Fen.
author_sort Cheng, Hao Fen.
collection NTU
description Wafer Fabrication Process is the starting point of making any integrated circuit (IC) products and is a complex process which goes through more than 900 operational steps before shipping for assembly and test. This makes the control of wafer fabrication process very challenging and the results can be very encouraging. Cycle time is the elapsed time from the releasing of blank silicon wafers into the fabrication process until completion of fabrication on those wafers, which is the key parameter to monitor and control the wafer fabrication process. In this project we are focusing on the wafer fabrication cycle time report Autobahn Report, which calculates and estimates the cycle time categorized by work shift and work weight based on real time production data. In addition to providing more accurate circle time by employing improved calculation algorithm, Autobahn report also allows to keep track of circle time by tagging into different type of wafers for different purposes. Lastly it highlights the variance of the real step cycle time and target step cycle time to monitor the bottleneck of the fabrication process. The presentation of this dissertation is based on the waterfall model in the sequential order of report analysis, report design, implementation and conclusion.
first_indexed 2024-10-01T07:15:36Z
format Final Year Project (FYP)
id ntu-10356/54511
institution Nanyang Technological University
language English
last_indexed 2024-10-01T07:15:36Z
publishDate 2013
record_format dspace
spelling ntu-10356/545112023-07-07T15:57:21Z Wafer fabrication cycle time report Cheng, Hao Fen. Shum Ping School of Electrical and Electronic Engineering DRNTU::Engineering::Electrical and electronic engineering::Semiconductors Wafer Fabrication Process is the starting point of making any integrated circuit (IC) products and is a complex process which goes through more than 900 operational steps before shipping for assembly and test. This makes the control of wafer fabrication process very challenging and the results can be very encouraging. Cycle time is the elapsed time from the releasing of blank silicon wafers into the fabrication process until completion of fabrication on those wafers, which is the key parameter to monitor and control the wafer fabrication process. In this project we are focusing on the wafer fabrication cycle time report Autobahn Report, which calculates and estimates the cycle time categorized by work shift and work weight based on real time production data. In addition to providing more accurate circle time by employing improved calculation algorithm, Autobahn report also allows to keep track of circle time by tagging into different type of wafers for different purposes. Lastly it highlights the variance of the real step cycle time and target step cycle time to monitor the bottleneck of the fabrication process. The presentation of this dissertation is based on the waterfall model in the sequential order of report analysis, report design, implementation and conclusion. Bachelor of Engineering 2013-06-21T04:41:17Z 2013-06-21T04:41:17Z 2013 2013 Final Year Project (FYP) http://hdl.handle.net/10356/54511 en Nanyang Technological University 63 p. application/pdf
spellingShingle DRNTU::Engineering::Electrical and electronic engineering::Semiconductors
Cheng, Hao Fen.
Wafer fabrication cycle time report
title Wafer fabrication cycle time report
title_full Wafer fabrication cycle time report
title_fullStr Wafer fabrication cycle time report
title_full_unstemmed Wafer fabrication cycle time report
title_short Wafer fabrication cycle time report
title_sort wafer fabrication cycle time report
topic DRNTU::Engineering::Electrical and electronic engineering::Semiconductors
url http://hdl.handle.net/10356/54511
work_keys_str_mv AT chenghaofen waferfabricationcycletimereport