Cost reduction and cycle-time improvement through collaborative engineering
The main focus of this dissertation is to analyze the new product development process for car radio products in a MNC company like Delphi Automotive Systems.
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/5684 |
_version_ | 1826115010541125632 |
---|---|
author | Doraisamy Raveendran |
author2 | Kim, Wangdo |
author_facet | Kim, Wangdo Doraisamy Raveendran |
author_sort | Doraisamy Raveendran |
collection | NTU |
description | The main focus of this dissertation is to analyze the new product development process for car radio products in a MNC company like Delphi Automotive Systems. |
first_indexed | 2024-10-01T03:48:32Z |
format | Thesis |
id | ntu-10356/5684 |
institution | Nanyang Technological University |
last_indexed | 2024-10-01T03:48:32Z |
publishDate | 2008 |
record_format | dspace |
spelling | ntu-10356/56842023-03-11T16:57:14Z Cost reduction and cycle-time improvement through collaborative engineering Doraisamy Raveendran Kim, Wangdo School of Mechanical and Production Engineering DRNTU::Engineering::Manufacturing::Production management The main focus of this dissertation is to analyze the new product development process for car radio products in a MNC company like Delphi Automotive Systems. Master of Science (Smart Product Design) 2008-09-17T10:56:36Z 2008-09-17T10:56:36Z 2001 2001 Thesis http://hdl.handle.net/10356/5684 Nanyang Technological University application/pdf |
spellingShingle | DRNTU::Engineering::Manufacturing::Production management Doraisamy Raveendran Cost reduction and cycle-time improvement through collaborative engineering |
title | Cost reduction and cycle-time improvement through collaborative engineering |
title_full | Cost reduction and cycle-time improvement through collaborative engineering |
title_fullStr | Cost reduction and cycle-time improvement through collaborative engineering |
title_full_unstemmed | Cost reduction and cycle-time improvement through collaborative engineering |
title_short | Cost reduction and cycle-time improvement through collaborative engineering |
title_sort | cost reduction and cycle time improvement through collaborative engineering |
topic | DRNTU::Engineering::Manufacturing::Production management |
url | http://hdl.handle.net/10356/5684 |
work_keys_str_mv | AT doraisamyraveendran costreductionandcycletimeimprovementthroughcollaborativeengineering |