Project risk management for underground project

This Final Year Report covers the analysis of underground tunnelling projects and develops a framework to compare the difference in the costs and time with the change of factors. The tunnelling methods that are focused on are the Drill & Blast method and Tunnel Boring Machine (TBM) method. Ris...

全面介绍

书目详细资料
主要作者: Ng, Junyang
其他作者: Tiong Lee Kong, Robert
格式: Final Year Project (FYP)
语言:English
出版: 2014
主题:
在线阅读:http://hdl.handle.net/10356/60084
_version_ 1826116604064169984
author Ng, Junyang
author2 Tiong Lee Kong, Robert
author_facet Tiong Lee Kong, Robert
Ng, Junyang
author_sort Ng, Junyang
collection NTU
description This Final Year Report covers the analysis of underground tunnelling projects and develops a framework to compare the difference in the costs and time with the change of factors. The tunnelling methods that are focused on are the Drill & Blast method and Tunnel Boring Machine (TBM) method. Risk management process and the different types of risks are being discussed to provide a better understanding of the risk assessment process. The geological parameters such as the RMR rating and Q-value parameters are used to determine geological conditions. Two actual projects, one from each tunnelling method, are being compared and analysed based on cost and time to model a cost estimation guideline. The costs are based on general factors such as labour, equipment and supplies, and other miscellaneous costs. The cost estimation model is created by extracting real time data, and can be used as future reference in tunnelling projects. These data can be used as a reference in conjunction with future projects to produce an efficient cost estimation strategy.
first_indexed 2024-10-01T04:14:27Z
format Final Year Project (FYP)
id ntu-10356/60084
institution Nanyang Technological University
language English
last_indexed 2024-10-01T04:14:27Z
publishDate 2014
record_format dspace
spelling ntu-10356/600842023-03-03T16:53:37Z Project risk management for underground project Ng, Junyang Tiong Lee Kong, Robert School of Civil and Environmental Engineering DRNTU::Engineering This Final Year Report covers the analysis of underground tunnelling projects and develops a framework to compare the difference in the costs and time with the change of factors. The tunnelling methods that are focused on are the Drill & Blast method and Tunnel Boring Machine (TBM) method. Risk management process and the different types of risks are being discussed to provide a better understanding of the risk assessment process. The geological parameters such as the RMR rating and Q-value parameters are used to determine geological conditions. Two actual projects, one from each tunnelling method, are being compared and analysed based on cost and time to model a cost estimation guideline. The costs are based on general factors such as labour, equipment and supplies, and other miscellaneous costs. The cost estimation model is created by extracting real time data, and can be used as future reference in tunnelling projects. These data can be used as a reference in conjunction with future projects to produce an efficient cost estimation strategy. Bachelor of Engineering (Civil) 2014-05-22T03:51:47Z 2014-05-22T03:51:47Z 2014 2014 Final Year Project (FYP) http://hdl.handle.net/10356/60084 en Nanyang Technological University 86 p. application/pdf
spellingShingle DRNTU::Engineering
Ng, Junyang
Project risk management for underground project
title Project risk management for underground project
title_full Project risk management for underground project
title_fullStr Project risk management for underground project
title_full_unstemmed Project risk management for underground project
title_short Project risk management for underground project
title_sort project risk management for underground project
topic DRNTU::Engineering
url http://hdl.handle.net/10356/60084
work_keys_str_mv AT ngjunyang projectriskmanagementforundergroundproject