A study of semiconductor back-end manufacturing : special focus on scheduling techniques
The purpose of this project was to study the impact of release input, lot dispatch and lot batching policies on the mean and variance of cycle time in the semiconductor back-end facility.
Автори: | , , |
---|---|
Інші автори: | |
Формат: | Дисертація |
Мова: | English |
Опубліковано: |
2014
|
Предмети: | |
Онлайн доступ: | http://hdl.handle.net/10356/60653 |
Search Result 1
A study of semiconductor back-end manufacturing : special focus on scheduling techniques
Опубліковано 2008
Отримати повний текст
Дисертація