Proposed redevelopment of existing buildings with enhanced plot ratio
Utilise an eight-stage framework to study a commercial site in the city that is affected by the revision. This will lead to a clear understanding of the process to decide on the quality, timeliness and cost when proceeding with a rehabilitation scheme of their existing buildings or redevelopment of...
Main Author: | |
---|---|
Other Authors: | |
Format: | Thesis |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6679 |
_version_ | 1826111835536883712 |
---|---|
author | Lim, Boon Kheng. |
author2 | Tiong, Robert Lee Kong |
author_facet | Tiong, Robert Lee Kong Lim, Boon Kheng. |
author_sort | Lim, Boon Kheng. |
collection | NTU |
description | Utilise an eight-stage framework to study a commercial site in the city that is affected by the revision. This will lead to a clear understanding of the process to decide on the quality, timeliness and cost when proceeding with a rehabilitation scheme of their existing buildings or redevelopment of their sites. |
first_indexed | 2024-10-01T02:57:01Z |
format | Thesis |
id | ntu-10356/6679 |
institution | Nanyang Technological University |
last_indexed | 2024-10-01T02:57:01Z |
publishDate | 2008 |
record_format | dspace |
spelling | ntu-10356/66792020-09-26T21:14:41Z Proposed redevelopment of existing buildings with enhanced plot ratio Lim, Boon Kheng. Tiong, Robert Lee Kong Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Construction management Utilise an eight-stage framework to study a commercial site in the city that is affected by the revision. This will lead to a clear understanding of the process to decide on the quality, timeliness and cost when proceeding with a rehabilitation scheme of their existing buildings or redevelopment of their sites. Master of Science (International Construction Management) 2008-09-17T11:50:51Z 2008-09-17T11:50:51Z 2004 2004 Thesis http://hdl.handle.net/10356/6679 Nanyang Technological University application/pdf |
spellingShingle | DRNTU::Engineering::Civil engineering::Construction management Lim, Boon Kheng. Proposed redevelopment of existing buildings with enhanced plot ratio |
title | Proposed redevelopment of existing buildings with enhanced plot ratio |
title_full | Proposed redevelopment of existing buildings with enhanced plot ratio |
title_fullStr | Proposed redevelopment of existing buildings with enhanced plot ratio |
title_full_unstemmed | Proposed redevelopment of existing buildings with enhanced plot ratio |
title_short | Proposed redevelopment of existing buildings with enhanced plot ratio |
title_sort | proposed redevelopment of existing buildings with enhanced plot ratio |
topic | DRNTU::Engineering::Civil engineering::Construction management |
url | http://hdl.handle.net/10356/6679 |
work_keys_str_mv | AT limboonkheng proposedredevelopmentofexistingbuildingswithenhancedplotratio |