Proposed redevelopment of existing buildings with enhanced plot ratio

Utilise an eight-stage framework to study a commercial site in the city that is affected by the revision. This will lead to a clear understanding of the process to decide on the quality, timeliness and cost when proceeding with a rehabilitation scheme of their existing buildings or redevelopment of...

Full description

Bibliographic Details
Main Author: Lim, Boon Kheng.
Other Authors: Tiong, Robert Lee Kong
Format: Thesis
Published: 2008
Subjects:
Online Access:http://hdl.handle.net/10356/6679
_version_ 1826111835536883712
author Lim, Boon Kheng.
author2 Tiong, Robert Lee Kong
author_facet Tiong, Robert Lee Kong
Lim, Boon Kheng.
author_sort Lim, Boon Kheng.
collection NTU
description Utilise an eight-stage framework to study a commercial site in the city that is affected by the revision. This will lead to a clear understanding of the process to decide on the quality, timeliness and cost when proceeding with a rehabilitation scheme of their existing buildings or redevelopment of their sites.
first_indexed 2024-10-01T02:57:01Z
format Thesis
id ntu-10356/6679
institution Nanyang Technological University
last_indexed 2024-10-01T02:57:01Z
publishDate 2008
record_format dspace
spelling ntu-10356/66792020-09-26T21:14:41Z Proposed redevelopment of existing buildings with enhanced plot ratio Lim, Boon Kheng. Tiong, Robert Lee Kong Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Construction management Utilise an eight-stage framework to study a commercial site in the city that is affected by the revision. This will lead to a clear understanding of the process to decide on the quality, timeliness and cost when proceeding with a rehabilitation scheme of their existing buildings or redevelopment of their sites. Master of Science (International Construction Management) 2008-09-17T11:50:51Z 2008-09-17T11:50:51Z 2004 2004 Thesis http://hdl.handle.net/10356/6679 Nanyang Technological University application/pdf
spellingShingle DRNTU::Engineering::Civil engineering::Construction management
Lim, Boon Kheng.
Proposed redevelopment of existing buildings with enhanced plot ratio
title Proposed redevelopment of existing buildings with enhanced plot ratio
title_full Proposed redevelopment of existing buildings with enhanced plot ratio
title_fullStr Proposed redevelopment of existing buildings with enhanced plot ratio
title_full_unstemmed Proposed redevelopment of existing buildings with enhanced plot ratio
title_short Proposed redevelopment of existing buildings with enhanced plot ratio
title_sort proposed redevelopment of existing buildings with enhanced plot ratio
topic DRNTU::Engineering::Civil engineering::Construction management
url http://hdl.handle.net/10356/6679
work_keys_str_mv AT limboonkheng proposedredevelopmentofexistingbuildingswithenhancedplotratio