Proposed redevelopment of existing buildings with enhanced plot ratio
Utilise an eight-stage framework to study a commercial site in the city that is affected by the revision. This will lead to a clear understanding of the process to decide on the quality, timeliness and cost when proceeding with a rehabilitation scheme of their existing buildings or redevelopment of...
Main Author: | Lim, Boon Kheng. |
---|---|
Other Authors: | Tiong, Robert Lee Kong |
Format: | Thesis |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6679 |
Similar Items
-
Harnessing Building Information Modelling (BIM) tools capabilities to enhance project productivity
by: Lim, Zhi Ying
Published: (2020) -
Commercial viability of two proposed privately-financed infrastructure projects in Singapore
by: Lim, Teck Leong.
Published: (2009) -
Current geotechnical engineering practices in Singapore and proposals for improvement
by: Seh, Chong Peng.
Published: (2011) -
Integrating green initiatives into existing commerical buildings
by: Cheng, Yew Leong
Published: (2010) -
The retrofitting of existing buildings for seismic criteria
by: Besing, Christa, 1978-
Published: (2006)