Risk management in MRT-construction project using probabilistic risk analysis
The primary focus of this study is to evaluate risk mitigation techniques for large transportation capital projects - (MRT) which are completed at the time of this study. The case study is a public transit project. The study initially focuses on risk measurement, achieved through use of the probabil...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Thesis |
Published: |
2008
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/6712 |
_version_ | 1811697321451192320 |
---|---|
author | Pakkrisamy Kalaichelvan Arumugam Vijayanarayanan |
author2 | Tiong, Robert Lee Kong |
author_facet | Tiong, Robert Lee Kong Pakkrisamy Kalaichelvan Arumugam Vijayanarayanan |
author_sort | Pakkrisamy Kalaichelvan |
collection | NTU |
description | The primary focus of this study is to evaluate risk mitigation techniques for large transportation capital projects - (MRT) which are completed at the time of this study. The case study is a public transit project. The study initially focuses on risk measurement, achieved through use of the probabilistic risk methodology. |
first_indexed | 2024-10-01T07:53:24Z |
format | Thesis |
id | ntu-10356/6712 |
institution | Nanyang Technological University |
last_indexed | 2024-10-01T07:53:24Z |
publishDate | 2008 |
record_format | dspace |
spelling | ntu-10356/67122020-09-26T21:21:22Z Risk management in MRT-construction project using probabilistic risk analysis Pakkrisamy Kalaichelvan Arumugam Vijayanarayanan Tiong, Robert Lee Kong Centre for Advanced Construction Studies DRNTU::Engineering::Civil engineering::Construction management The primary focus of this study is to evaluate risk mitigation techniques for large transportation capital projects - (MRT) which are completed at the time of this study. The case study is a public transit project. The study initially focuses on risk measurement, achieved through use of the probabilistic risk methodology. Master of Science (International Construction Management) 2008-09-17T11:51:39Z 2008-09-17T11:51:39Z 2005 2005 Thesis http://hdl.handle.net/10356/6712 Nanyang Technological University application/pdf |
spellingShingle | DRNTU::Engineering::Civil engineering::Construction management Pakkrisamy Kalaichelvan Arumugam Vijayanarayanan Risk management in MRT-construction project using probabilistic risk analysis |
title | Risk management in MRT-construction project using probabilistic risk analysis |
title_full | Risk management in MRT-construction project using probabilistic risk analysis |
title_fullStr | Risk management in MRT-construction project using probabilistic risk analysis |
title_full_unstemmed | Risk management in MRT-construction project using probabilistic risk analysis |
title_short | Risk management in MRT-construction project using probabilistic risk analysis |
title_sort | risk management in mrt construction project using probabilistic risk analysis |
topic | DRNTU::Engineering::Civil engineering::Construction management |
url | http://hdl.handle.net/10356/6712 |
work_keys_str_mv | AT pakkrisamykalaichelvan riskmanagementinmrtconstructionprojectusingprobabilisticriskanalysis AT arumugamvijayanarayanan riskmanagementinmrtconstructionprojectusingprobabilisticriskanalysis |