BIM 3D, 4D and 5D for schedule, budget evaluation and analysing of civil Tuas Sewer works
This report presents the findings of Building Information Modelling (BIM) for Tuas Sewer Works through my research and experience. Cases are built upon to form a strong argument to encourage the use of BIM. It is important to look into the usage of BIM modelling to explore the possibility of improvi...
Main Author: | Riduan Abdul Hussein |
---|---|
Other Authors: | Tiong Lee Kong, Robert |
Format: | Final Year Project (FYP) |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/68218 |
Similar Items
-
Optimisation of 4D (project timeline) and 5D (budget analysis) in building information modelling (BIM) for house refurbishment and renovation
by: Nurdini Atiqah Talib
Published: (2022) -
Optimizing the implementation of building information modelling BIM 4D (scheduling) and 5D (cost) in highway and bridge construction
by: Jimmyson Anak Manggi
Published: (2022) -
BIM4D-based scheduling for assembling and lifting in precast-enabled construction
by: Huang, Lihui, et al.
Published: (2022) -
The Creation of Construction Schedules in 4D BIM: A Comparison of Conventional and Automated Approaches
by: Omar Doukari, et al.
Published: (2022-08-01) -
Implementation of 4D/BIM in the Iraqi construction industry
by: Hamada, Hussein M., et al.
Published: (2017)