Grouting in rock cavern : a case study

The construction of deep subsea cavern is very risky and costly. One of the major risks is water inflow into the cavern. Rock pre-grouting is used to seal the tunnels and caverns from excessive water inflow. This method has been considered to be notoriously unpredictable and relied heavily on the en...

Full description

Bibliographic Details
Main Author: Indera, Reka Putra
Other Authors: Zhao Zhiye
Format: Final Year Project (FYP)
Language:English
Published: 2019
Subjects:
Online Access:http://hdl.handle.net/10356/78081
_version_ 1826116747326914560
author Indera, Reka Putra
author2 Zhao Zhiye
author_facet Zhao Zhiye
Indera, Reka Putra
author_sort Indera, Reka Putra
collection NTU
description The construction of deep subsea cavern is very risky and costly. One of the major risks is water inflow into the cavern. Rock pre-grouting is used to seal the tunnels and caverns from excessive water inflow. This method has been considered to be notoriously unpredictable and relied heavily on the engineers’ experiences. This research did a case study with the grouting data from tunnel OT01-c provided by the Jurong Rock Cavern (JRC) owner to predict the grouting volume needed to seal the tunnel. Large amount of grouting data was extracted, pre-processed and transformed to be a clean dataset fit for Artificial Neural Network (ANN) input. The ANN model developed has reasonable capacity (accuracy and reliability) and could be used to predict grouting volume for different tunnel section. In addition of using machine learning tool like ANN, the research also explored the data using conventional techniques such as regression and statistical graphic methods. These methods have revealed many insights regarding the relationship between parameters. For example, it was found that Rock Quality Designation (RQD) has little importance in influencing the grout take volume. This research has provided a broader understanding and perspective about rock grouting especially about parameters that influence the grouting volume.
first_indexed 2024-10-01T04:16:44Z
format Final Year Project (FYP)
id ntu-10356/78081
institution Nanyang Technological University
language English
last_indexed 2024-10-01T04:16:44Z
publishDate 2019
record_format dspace
spelling ntu-10356/780812023-03-03T17:11:20Z Grouting in rock cavern : a case study Indera, Reka Putra Zhao Zhiye School of Civil and Environmental Engineering JTC Corporation Liu Qian DRNTU::Engineering::Civil engineering The construction of deep subsea cavern is very risky and costly. One of the major risks is water inflow into the cavern. Rock pre-grouting is used to seal the tunnels and caverns from excessive water inflow. This method has been considered to be notoriously unpredictable and relied heavily on the engineers’ experiences. This research did a case study with the grouting data from tunnel OT01-c provided by the Jurong Rock Cavern (JRC) owner to predict the grouting volume needed to seal the tunnel. Large amount of grouting data was extracted, pre-processed and transformed to be a clean dataset fit for Artificial Neural Network (ANN) input. The ANN model developed has reasonable capacity (accuracy and reliability) and could be used to predict grouting volume for different tunnel section. In addition of using machine learning tool like ANN, the research also explored the data using conventional techniques such as regression and statistical graphic methods. These methods have revealed many insights regarding the relationship between parameters. For example, it was found that Rock Quality Designation (RQD) has little importance in influencing the grout take volume. This research has provided a broader understanding and perspective about rock grouting especially about parameters that influence the grouting volume. Bachelor of Engineering (Civil) 2019-06-11T08:57:59Z 2019-06-11T08:57:59Z 2019 Final Year Project (FYP) http://hdl.handle.net/10356/78081 en Nanyang Technological University 102 p. application/pdf
spellingShingle DRNTU::Engineering::Civil engineering
Indera, Reka Putra
Grouting in rock cavern : a case study
title Grouting in rock cavern : a case study
title_full Grouting in rock cavern : a case study
title_fullStr Grouting in rock cavern : a case study
title_full_unstemmed Grouting in rock cavern : a case study
title_short Grouting in rock cavern : a case study
title_sort grouting in rock cavern a case study
topic DRNTU::Engineering::Civil engineering
url http://hdl.handle.net/10356/78081
work_keys_str_mv AT inderarekaputra groutinginrockcavernacasestudy