An integrated moving bed ceramic membrane bioreactor and reverse osmosis process for NEWater production
Nowadays, water scarcity is becoming more severe due to increasing water demand. It has been widely accepted that NEWater production from wastewater is a promising alternative to alleviate the water shortage. However, the current NEWater production process adopts the conventional biological process...
Main Author: | Teo, Sarah Xue Ling |
---|---|
Other Authors: | Liu Yu |
Format: | Final Year Project (FYP) |
Language: | English |
Published: |
2019
|
Subjects: | |
Online Access: | http://hdl.handle.net/10356/78751 |
Similar Items
-
Performance, membrane fouling control and cost analysis of an integrated anaerobic fixed-film MBR and reverse osmosis process for municipal wastewater reclamation to NEWater-like product water
by: Liu, Hang, et al.
Published: (2022) -
A novel nanofiltration based membrane bioreactor (NF-MBR) and reverse osmosis (RO) for water reclamation
by: Tay, Ming Feng
Published: (2020) -
Development of novel submerged anaerobic osmosis membrane bioreactor
by: Gu, Yangshuo
Published: (2015) -
Synthesis of substrates for reverse osmosis membranes
by: Gao, Yiben.
Published: (2009) -
Membrane fouling in seawater reverse osmosis (SWRO) desalination process
by: Yin, Wenqiang
Published: (2020)