Automaton-based timed supervisory control for operational planning and scheduling under multiple job deadlines

In this paper we model an operational planning and scheduling problem under multiple job deadlines in a timeweighted automaton framework. We first present a method to determine whether all given job specifications and deadlines can be met by computing a supremal controllable job satisfaction su...

Full description

Bibliographic Details
Main Authors: Lin, Liyong, Shehabinia, Ahmad Reza, Brandin, Bertil, Su, Rong.
Other Authors: School of Electrical and Electronic Engineering
Format: Conference Paper
Language:English
Published: 2016
Subjects:
Online Access:https://hdl.handle.net/10356/81363
http://hdl.handle.net/10220/39542
_version_ 1826118299902017536
author Lin, Liyong
Shehabinia, Ahmad Reza
Brandin, Bertil
Su, Rong.
author2 School of Electrical and Electronic Engineering
author_facet School of Electrical and Electronic Engineering
Lin, Liyong
Shehabinia, Ahmad Reza
Brandin, Bertil
Su, Rong.
author_sort Lin, Liyong
collection NTU
description In this paper we model an operational planning and scheduling problem under multiple job deadlines in a timeweighted automaton framework. We first present a method to determine whether all given job specifications and deadlines can be met by computing a supremal controllable job satisfaction sublanguage. When this supremal sublanguage is not empty, we compute one of its controllable sublanguages that ensures the minimum total job earliness by adding proper delays. When this supremal sublangauge is empty, we will determine the minimal sets of job deadlines that need to be relaxed.
first_indexed 2024-10-01T04:41:27Z
format Conference Paper
id ntu-10356/81363
institution Nanyang Technological University
language English
last_indexed 2024-10-01T04:41:27Z
publishDate 2016
record_format dspace
spelling ntu-10356/813632021-01-06T01:42:36Z Automaton-based timed supervisory control for operational planning and scheduling under multiple job deadlines Lin, Liyong Shehabinia, Ahmad Reza Brandin, Bertil Su, Rong. School of Electrical and Electronic Engineering 2014 IEEE 53rd Annual Conference on Decision and Control (CDC) Time-weighted automaton Controllability Scheduling Earliness Timed supervisory control In this paper we model an operational planning and scheduling problem under multiple job deadlines in a timeweighted automaton framework. We first present a method to determine whether all given job specifications and deadlines can be met by computing a supremal controllable job satisfaction sublanguage. When this supremal sublanguage is not empty, we compute one of its controllable sublanguages that ensures the minimum total job earliness by adding proper delays. When this supremal sublangauge is empty, we will determine the minimal sets of job deadlines that need to be relaxed. Accepted version 2016-01-04T07:10:02Z 2019-12-06T14:29:18Z 2016-01-04T07:10:02Z 2019-12-06T14:29:18Z 2014 Conference Paper Lin, L., Shehabinia, A. R., Su, R., & Brandin, B. (2014). Automaton-based timed supervisory control for operational planning and scheduling under multiple job deadlines. 2014 IEEE 53rd Annual Conference on Decision and Control (CDC), 5943-5948. https://hdl.handle.net/10356/81363 http://hdl.handle.net/10220/39542 10.1109/CDC.2014.7040319 en © 2014 IEEE. Personal use of this material is permitted. Permission from IEEE must be obtained for all other uses, in any current or future media, including reprinting/republishing this material for advertising or promotional purposes, creating new collective works, for resale or redistribution to servers or lists, or reuse of any copyrighted component of this work in other works. The published version is available at: [http://dx.doi.org/110.1109/CDC.2014.7040319]. 6 p. application/pdf
spellingShingle Time-weighted automaton
Controllability
Scheduling
Earliness
Timed supervisory control
Lin, Liyong
Shehabinia, Ahmad Reza
Brandin, Bertil
Su, Rong.
Automaton-based timed supervisory control for operational planning and scheduling under multiple job deadlines
title Automaton-based timed supervisory control for operational planning and scheduling under multiple job deadlines
title_full Automaton-based timed supervisory control for operational planning and scheduling under multiple job deadlines
title_fullStr Automaton-based timed supervisory control for operational planning and scheduling under multiple job deadlines
title_full_unstemmed Automaton-based timed supervisory control for operational planning and scheduling under multiple job deadlines
title_short Automaton-based timed supervisory control for operational planning and scheduling under multiple job deadlines
title_sort automaton based timed supervisory control for operational planning and scheduling under multiple job deadlines
topic Time-weighted automaton
Controllability
Scheduling
Earliness
Timed supervisory control
url https://hdl.handle.net/10356/81363
http://hdl.handle.net/10220/39542
work_keys_str_mv AT linliyong automatonbasedtimedsupervisorycontrolforoperationalplanningandschedulingundermultiplejobdeadlines
AT shehabiniaahmadreza automatonbasedtimedsupervisorycontrolforoperationalplanningandschedulingundermultiplejobdeadlines
AT brandinbertil automatonbasedtimedsupervisorycontrolforoperationalplanningandschedulingundermultiplejobdeadlines
AT surong automatonbasedtimedsupervisorycontrolforoperationalplanningandschedulingundermultiplejobdeadlines