Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation

As battery technology matures, the battery energy storage system (BESS) becomes a promising candidate for addressing renewable energy uncertainties. BESS degradation is one of key factors in BESS operations, which is usually considered in the planning stage. However, BESS degradations are directly a...

Full description

Bibliographic Details
Main Authors: Xu, Yan, Zhao, Tianyang, Zhao, Shuqiang, Zhang, Jianhua, Wang, Yang
Other Authors: Energy Research Institute @ NTU (ERI@N)
Format: Journal Article
Language:English
Published: 2019
Subjects:
Online Access:https://hdl.handle.net/10356/83402
http://hdl.handle.net/10220/49120
_version_ 1826123386580893696
author Xu, Yan
Zhao, Tianyang
Zhao, Shuqiang
Zhang, Jianhua
Wang, Yang
author2 Energy Research Institute @ NTU (ERI@N)
author_facet Energy Research Institute @ NTU (ERI@N)
Xu, Yan
Zhao, Tianyang
Zhao, Shuqiang
Zhang, Jianhua
Wang, Yang
author_sort Xu, Yan
collection NTU
description As battery technology matures, the battery energy storage system (BESS) becomes a promising candidate for addressing renewable energy uncertainties. BESS degradation is one of key factors in BESS operations, which is usually considered in the planning stage. However, BESS degradations are directly affected by the depth of discharge (DoD), which is closely related to the BESS daily schedule. Specifically, the BESS life losses may be different when providing the same amount of energy under a distinct DoD. Therefore, it is necessary to develop a model to consider the effect of daily discharge on BESS degradation. In this paper, a model quantifying the nonlinear impact of DoD on BESS life loss is proposed. By adopting the chance-constrained goal programming, the degradation in day-ahead unit commitment is formulated as a multi-objective optimization problem. To facilitate an efficient solution, the model is converted into a mixed integer linear programming problem. The effectiveness of the proposed method is verified in a modified IEEE 39-bus system.
first_indexed 2024-10-01T06:03:49Z
format Journal Article
id ntu-10356/83402
institution Nanyang Technological University
language English
last_indexed 2024-10-01T06:03:49Z
publishDate 2019
record_format dspace
spelling ntu-10356/834022021-01-10T11:46:23Z Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation Xu, Yan Zhao, Tianyang Zhao, Shuqiang Zhang, Jianhua Wang, Yang Energy Research Institute @ NTU (ERI@N) Chance Constraints BESS Degradation Engineering::Electrical and electronic engineering As battery technology matures, the battery energy storage system (BESS) becomes a promising candidate for addressing renewable energy uncertainties. BESS degradation is one of key factors in BESS operations, which is usually considered in the planning stage. However, BESS degradations are directly affected by the depth of discharge (DoD), which is closely related to the BESS daily schedule. Specifically, the BESS life losses may be different when providing the same amount of energy under a distinct DoD. Therefore, it is necessary to develop a model to consider the effect of daily discharge on BESS degradation. In this paper, a model quantifying the nonlinear impact of DoD on BESS life loss is proposed. By adopting the chance-constrained goal programming, the degradation in day-ahead unit commitment is formulated as a multi-objective optimization problem. To facilitate an efficient solution, the model is converted into a mixed integer linear programming problem. The effectiveness of the proposed method is verified in a modified IEEE 39-bus system. Published version 2019-07-04T01:33:43Z 2019-12-06T15:21:42Z 2019-07-04T01:33:43Z 2019-12-06T15:21:42Z 2018 Journal Article Xu, Y., Zhao, T., Zhao, S., Zhang, J., & Wang, Y. (2018). Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation. CSEE Journal of Power and Energy Systems, 4(3), 316-325. doi:10.17775/CSEEJPES.2016.01050 2096-0042 https://hdl.handle.net/10356/83402 http://hdl.handle.net/10220/49120 10.17775/CSEEJPES.2016.01050 en CSEE Journal of Power and Energy Systems © 2016 CSEE (published by IEEE). This is an open-access article distributed under the terms of the Creative Commons Attribution License. 10 p. application/pdf
spellingShingle Chance Constraints
BESS Degradation
Engineering::Electrical and electronic engineering
Xu, Yan
Zhao, Tianyang
Zhao, Shuqiang
Zhang, Jianhua
Wang, Yang
Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation
title Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation
title_full Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation
title_fullStr Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation
title_full_unstemmed Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation
title_short Multi-objective chance-constrained optimal day-ahead scheduling considering BESS degradation
title_sort multi objective chance constrained optimal day ahead scheduling considering bess degradation
topic Chance Constraints
BESS Degradation
Engineering::Electrical and electronic engineering
url https://hdl.handle.net/10356/83402
http://hdl.handle.net/10220/49120
work_keys_str_mv AT xuyan multiobjectivechanceconstrainedoptimaldayaheadschedulingconsideringbessdegradation
AT zhaotianyang multiobjectivechanceconstrainedoptimaldayaheadschedulingconsideringbessdegradation
AT zhaoshuqiang multiobjectivechanceconstrainedoptimaldayaheadschedulingconsideringbessdegradation
AT zhangjianhua multiobjectivechanceconstrainedoptimaldayaheadschedulingconsideringbessdegradation
AT wangyang multiobjectivechanceconstrainedoptimaldayaheadschedulingconsideringbessdegradation