Reliability assessment of restructured power systems using optimal load shedding technique
Power systemrestructuring and deregulation has changed the strategy of reliabilitymanagement of a power system. Load shedding, and generation and reserve re-dispatch methods used in the existing reliability evaluation techniques have to be improved to incorporate these changes. An optimisation techn...
Main Authors: | Wang, Peng, Ding, Yi, Goel, Lalit |
---|---|
Other Authors: | School of Electrical and Electronic Engineering |
Format: | Journal Article |
Language: | English |
Published: |
2011
|
Subjects: | |
Online Access: | https://hdl.handle.net/10356/94276 http://hdl.handle.net/10220/7186 |
Similar Items
-
Dynamic reliability assessment for bilateral contract electricity providers in restructured power systems
by: Ding, Yi, et al.
Published: (2011) -
Reliability evaluation of power systems considering restructuring and renewable generators
by: Mehrtash, Amir, et al.
Published: (2013) -
Reliability-based long term hydro/thermal reserve allocation of power systems with high wind power penetration
by: Andrew, M., et al.
Published: (2011) -
Long-term reserve expansion of power systems with high wind power penetration using universal generating function methods
by: Ding, Yi, et al.
Published: (2011) -
Demand side load management of smart grids using Intelligent trading/metering/billing system
by: Wang, Peng, et al.
Published: (2011)