Analisis Penentuan Buffer Stock BatubaraStudi Kasus di PT Pembangkitan Jawa-Bali Unit Pembangkitan Paiton

This study is aimed to conduct an analysis to determine the minimum, maximum, and safety buffer stock of coal for PT Pembangkitan Jawa-Bali, Unit Pembangkitan Paiton. The analysis was established to anticipate the round trip days (RTD) difference between one supplier to another, with different milea...

Full description

Bibliographic Details
Main Authors: , Harry Purnomo, , Dr. Sony Warsono, MAFIS, Ak.
Format: Thesis
Published: [Yogyakarta] : Universitas Gadjah Mada 2013
Subjects:
ETD
_version_ 1826045980037873664
author , Harry Purnomo
, Dr. Sony Warsono, MAFIS, Ak.
author_facet , Harry Purnomo
, Dr. Sony Warsono, MAFIS, Ak.
author_sort , Harry Purnomo
collection UGM
description This study is aimed to conduct an analysis to determine the minimum, maximum, and safety buffer stock of coal for PT Pembangkitan Jawa-Bali, Unit Pembangkitan Paiton. The analysis was established to anticipate the round trip days (RTD) difference between one supplier to another, with different mileage by different coal source location, while the stock should always be available. Moreover, in determining the supply of specified minimum and maximum limits to be there every month, as well as the unique properties of the coal stock yard in which is just hold on for 30 days before going on its self combustion. Thus, the determination of the amount of buffer stock required minimum, maximum, and safe, and safety buffer stock mechanism fulfillment. Through the analysis of the daily requirement of coal and the RTD can be completed the minimum, maximum, and safety buffer stock calculations, and the appropriate mechanism of coal stock fulfillment. The results showed that the minimum buffer stock that must be fulfilled for the continuity of the operation unit is equal to 83.875,43 tons/month, and 41.937,72 tonnes in the month overhaul. Meanwhile, the maximum buffer stock is equal to 167.751 tons/per month, while the total of 83.875,5 tons of time to overhaul the 30-day operation today. Furthermore, the buffer stock is safe for at 125.813,145 tons/per month, whereas at the time of overhaul as much as 62.906,57 tonnes with 30-day period of operating days.
first_indexed 2024-03-13T22:45:58Z
format Thesis
id oai:generic.eprints.org:118279
institution Universiti Gadjah Mada
last_indexed 2024-03-13T22:45:58Z
publishDate 2013
publisher [Yogyakarta] : Universitas Gadjah Mada
record_format dspace
spelling oai:generic.eprints.org:1182792016-03-04T08:38:41Z https://repository.ugm.ac.id/118279/ Analisis Penentuan Buffer Stock BatubaraStudi Kasus di PT Pembangkitan Jawa-Bali Unit Pembangkitan Paiton , Harry Purnomo , Dr. Sony Warsono, MAFIS, Ak. ETD This study is aimed to conduct an analysis to determine the minimum, maximum, and safety buffer stock of coal for PT Pembangkitan Jawa-Bali, Unit Pembangkitan Paiton. The analysis was established to anticipate the round trip days (RTD) difference between one supplier to another, with different mileage by different coal source location, while the stock should always be available. Moreover, in determining the supply of specified minimum and maximum limits to be there every month, as well as the unique properties of the coal stock yard in which is just hold on for 30 days before going on its self combustion. Thus, the determination of the amount of buffer stock required minimum, maximum, and safe, and safety buffer stock mechanism fulfillment. Through the analysis of the daily requirement of coal and the RTD can be completed the minimum, maximum, and safety buffer stock calculations, and the appropriate mechanism of coal stock fulfillment. The results showed that the minimum buffer stock that must be fulfilled for the continuity of the operation unit is equal to 83.875,43 tons/month, and 41.937,72 tonnes in the month overhaul. Meanwhile, the maximum buffer stock is equal to 167.751 tons/per month, while the total of 83.875,5 tons of time to overhaul the 30-day operation today. Furthermore, the buffer stock is safe for at 125.813,145 tons/per month, whereas at the time of overhaul as much as 62.906,57 tonnes with 30-day period of operating days. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , Harry Purnomo and , Dr. Sony Warsono, MAFIS, Ak. (2013) Analisis Penentuan Buffer Stock BatubaraStudi Kasus di PT Pembangkitan Jawa-Bali Unit Pembangkitan Paiton. UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=58223
spellingShingle ETD
, Harry Purnomo
, Dr. Sony Warsono, MAFIS, Ak.
Analisis Penentuan Buffer Stock BatubaraStudi Kasus di PT Pembangkitan Jawa-Bali Unit Pembangkitan Paiton
title Analisis Penentuan Buffer Stock BatubaraStudi Kasus di PT Pembangkitan Jawa-Bali Unit Pembangkitan Paiton
title_full Analisis Penentuan Buffer Stock BatubaraStudi Kasus di PT Pembangkitan Jawa-Bali Unit Pembangkitan Paiton
title_fullStr Analisis Penentuan Buffer Stock BatubaraStudi Kasus di PT Pembangkitan Jawa-Bali Unit Pembangkitan Paiton
title_full_unstemmed Analisis Penentuan Buffer Stock BatubaraStudi Kasus di PT Pembangkitan Jawa-Bali Unit Pembangkitan Paiton
title_short Analisis Penentuan Buffer Stock BatubaraStudi Kasus di PT Pembangkitan Jawa-Bali Unit Pembangkitan Paiton
title_sort analisis penentuan buffer stock batubarastudi kasus di pt pembangkitan jawa bali unit pembangkitan paiton
topic ETD
work_keys_str_mv AT harrypurnomo analisispenentuanbufferstockbatubarastudikasusdiptpembangkitanjawabaliunitpembangkitanpaiton
AT drsonywarsonomafisak analisispenentuanbufferstockbatubarastudikasusdiptpembangkitanjawabaliunitpembangkitanpaiton