Summary: | Decision-making to determine the winner of project tender (not complex
one) on the construction of college buildings for Economics Faculty of Udayana
University by tender committee at the Rectorate Equipment Section of Udayana
University, still is carried out manually (applying Microsoft Excel and Word), so
to assist and accelerate the decision (in this situation a few/many bidders met all
evaluation criteria and have the same lowest bidding price corrected under HPS),
this study aims to build a DSS (Decision Supporting System) with Fuzzy AHP
method.
The applied Fuzzy AHP version is Chang model (1992) because it has
simple steps and easy to apply in this study. The results showed that SPK
produced ranking method of 1, 2, and 3 that are similar to the existing manual
system in Equipment Section of the Rectorate, though the ranking method of 4, 5,
6, which also produced by SPK, is not contained in the manual system because
ranking method of 4, 5, 6 did not meet the qualifying criteria evaluation (a
requirement for graduation is to fulfill all tender evaluation criteria). It, therefore,
comes to conclude that the DSS produce valid information.
|