EVALUASI JEMBATAN DENGAN METODE BRIDGE MANAGEMENT SYSTEM (BMS) (Studi Kasus : Jembatan Nasional pada Jalan di Propinsi Maluku)
Bridges as transport infrastructures play a vital role in smoothing traffic flows. The success of a bridge in playing its role and serving its function depends on its management. Currently, the government, through the Directorate General of Highways of the Ministry of Public Work, has used a system...
Main Authors: | , |
---|---|
Format: | Thesis |
Published: |
[Yogyakarta] : Universitas Gadjah Mada
2013
|
Subjects: |
_version_ | 1826046292213628928 |
---|---|
author | , Erwin Marasabessy, ST. , Dr.-Ing. Ir. Andreas Triwiyono |
author_facet | , Erwin Marasabessy, ST. , Dr.-Ing. Ir. Andreas Triwiyono |
author_sort | , Erwin Marasabessy, ST. |
collection | UGM |
description | Bridges as transport infrastructures play a vital role in smoothing traffic flows. The success of a bridge in playing its role and serving its function depends on its management. Currently, the government, through the Directorate General of Highways of the Ministry of Public Work, has used a system to manage bridges, known as the Bridge Management System (BMS). The system allows a systematic plan and provides a uniform procedure for all bridge operation activities on the national and provincial level.
Data from Implementation Agency of National Inter-Urban Roads of Area IX, Maluku�Northern Maluku in 2011, indicate that the total length of national roads in Maluku Province is 15.238,01 M, with a total of 562 bridges. In Ambon Island, especially, there are 52 bridges totaling 1.176,25 m in length. The study was conducted at several inter-urban bridges in Maluku Province of Ambon Island: Wai Batu Merah, Wai Ruhu, Wai Lawa, Wai Yari and Wai Tua bridges. Assessment of bridge structure conditions was conducted visually to determine the conditions of the existing bridges comprehensively by referring to the Bridge Management System (BMS) complemented with a computer-based Bridge Management Information System (BMIS).
Condition scores for the five bridges�Wai Batu Merah, Wai Ruhu, Wai Lawa, Wai Yari, and Wai Tua�according to Bridge Management System, are 2, 1, 2, 1, 2, respectively. The scores of the five bridges indicate that their physical condition can be categorized as good or with minor defects. Based on technical screening, the proposed treatment for Wai Batu Merah, Wai Ruhu, Wai Lawa, dan Wai Tua bridges is the rehabilitation of their sub-elements. As for the Wai Yari bridge, the treatment will be routine maintenance. The defect repair costs are IDR149.138.238,00, IDR81.048.000,00, IDR174.579.106,10, IDR79.233.324,01 and IDR238.323.258,60 for Wai Batu, Wai Ruhu, Wai Lawa, Wai Yari, and Wai Tua Bridges, respectively. |
first_indexed | 2024-03-13T22:50:53Z |
format | Thesis |
id | oai:generic.eprints.org:119819 |
institution | Universiti Gadjah Mada |
last_indexed | 2024-03-13T22:50:53Z |
publishDate | 2013 |
publisher | [Yogyakarta] : Universitas Gadjah Mada |
record_format | dspace |
spelling | oai:generic.eprints.org:1198192016-03-04T08:34:39Z https://repository.ugm.ac.id/119819/ EVALUASI JEMBATAN DENGAN METODE BRIDGE MANAGEMENT SYSTEM (BMS) (Studi Kasus : Jembatan Nasional pada Jalan di Propinsi Maluku) , Erwin Marasabessy, ST. , Dr.-Ing. Ir. Andreas Triwiyono ETD Bridges as transport infrastructures play a vital role in smoothing traffic flows. The success of a bridge in playing its role and serving its function depends on its management. Currently, the government, through the Directorate General of Highways of the Ministry of Public Work, has used a system to manage bridges, known as the Bridge Management System (BMS). The system allows a systematic plan and provides a uniform procedure for all bridge operation activities on the national and provincial level. Data from Implementation Agency of National Inter-Urban Roads of Area IX, Maluku�Northern Maluku in 2011, indicate that the total length of national roads in Maluku Province is 15.238,01 M, with a total of 562 bridges. In Ambon Island, especially, there are 52 bridges totaling 1.176,25 m in length. The study was conducted at several inter-urban bridges in Maluku Province of Ambon Island: Wai Batu Merah, Wai Ruhu, Wai Lawa, Wai Yari and Wai Tua bridges. Assessment of bridge structure conditions was conducted visually to determine the conditions of the existing bridges comprehensively by referring to the Bridge Management System (BMS) complemented with a computer-based Bridge Management Information System (BMIS). Condition scores for the five bridges�Wai Batu Merah, Wai Ruhu, Wai Lawa, Wai Yari, and Wai Tua�according to Bridge Management System, are 2, 1, 2, 1, 2, respectively. The scores of the five bridges indicate that their physical condition can be categorized as good or with minor defects. Based on technical screening, the proposed treatment for Wai Batu Merah, Wai Ruhu, Wai Lawa, dan Wai Tua bridges is the rehabilitation of their sub-elements. As for the Wai Yari bridge, the treatment will be routine maintenance. The defect repair costs are IDR149.138.238,00, IDR81.048.000,00, IDR174.579.106,10, IDR79.233.324,01 and IDR238.323.258,60 for Wai Batu, Wai Ruhu, Wai Lawa, Wai Yari, and Wai Tua Bridges, respectively. [Yogyakarta] : Universitas Gadjah Mada 2013 Thesis NonPeerReviewed , Erwin Marasabessy, ST. and , Dr.-Ing. Ir. Andreas Triwiyono (2013) EVALUASI JEMBATAN DENGAN METODE BRIDGE MANAGEMENT SYSTEM (BMS) (Studi Kasus : Jembatan Nasional pada Jalan di Propinsi Maluku). UNSPECIFIED thesis, UNSPECIFIED. http://etd.ugm.ac.id/index.php?mod=penelitian_detail&sub=PenelitianDetail&act=view&typ=html&buku_id=59824 |
spellingShingle | ETD , Erwin Marasabessy, ST. , Dr.-Ing. Ir. Andreas Triwiyono EVALUASI JEMBATAN DENGAN METODE BRIDGE MANAGEMENT SYSTEM (BMS) (Studi Kasus : Jembatan Nasional pada Jalan di Propinsi Maluku) |
title | EVALUASI JEMBATAN
DENGAN METODE BRIDGE MANAGEMENT SYSTEM (BMS)
(Studi Kasus : Jembatan Nasional pada Jalan di Propinsi Maluku) |
title_full | EVALUASI JEMBATAN
DENGAN METODE BRIDGE MANAGEMENT SYSTEM (BMS)
(Studi Kasus : Jembatan Nasional pada Jalan di Propinsi Maluku) |
title_fullStr | EVALUASI JEMBATAN
DENGAN METODE BRIDGE MANAGEMENT SYSTEM (BMS)
(Studi Kasus : Jembatan Nasional pada Jalan di Propinsi Maluku) |
title_full_unstemmed | EVALUASI JEMBATAN
DENGAN METODE BRIDGE MANAGEMENT SYSTEM (BMS)
(Studi Kasus : Jembatan Nasional pada Jalan di Propinsi Maluku) |
title_short | EVALUASI JEMBATAN
DENGAN METODE BRIDGE MANAGEMENT SYSTEM (BMS)
(Studi Kasus : Jembatan Nasional pada Jalan di Propinsi Maluku) |
title_sort | evaluasi jembatan dengan metode bridge management system bms studi kasus jembatan nasional pada jalan di propinsi maluku |
topic | ETD |
work_keys_str_mv | AT erwinmarasabessyst evaluasijembatandenganmetodebridgemanagementsystembmsstudikasusjembatannasionalpadajalandipropinsimaluku AT dringirandreastriwiyono evaluasijembatandenganmetodebridgemanagementsystembmsstudikasusjembatannasionalpadajalandipropinsimaluku |